Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Recovery_time_objective> ?p ?o }
Showing triples 1 to 37 of
37
with 100 triples per page.
- Recovery_time_objective abstract "The recovery time objective (RTO) is the targeted duration of time and a service level within which a business process must be restored after a disaster (or disruption) in order to avoid unacceptable consequences associated with a break in business continuity.It can include the time for trying to fix the problem without a recovery, the recovery itself, testing, and the communication to the users. Decision time for users representative is not included.The business continuity timeline usually runs parallel with an incident management timeline and may start at the same, or different, points.In accepted business continuity planning methodology, the RTO is established during the Business Impact Analysis (BIA) by the owner of a process (usually in conjunction with the business continuity planner). The RTOs are then presented to senior management for acceptance.The RTO attaches to the business process and not the resources required to support the process.The RTO and the results of the BIA in its entirety provide the basis for identifying and analyzing viable strategies for inclusion in the business continuity plan. Viable strategy options would include any which would enable resumption of a business process in a time frame at or near the RTO. This would include alternate or manual workaround procedures and would not necessarily require computer systems to meet the RTOs.The \"O\" in RTO stands for objective, not mandate. In reality, tactics are often selected that will not meet the RTO. In this instance, the RTO will not be met but should still remain an objective of future strategy revision.In a good deal of the literature on this subject, RTO is spoken of as a complement of recovery point objective (RPO), with the two metrics describing the limits of acceptable or \"tolerable\" ITSC performance in terms of time lost (RTO) from normal business process functioning, and in terms of data lost or not backed up during that period of time (RPO) respectively.".
- Recovery_time_objective wikiPageExternalLink glossary.html.
- Recovery_time_objective wikiPageExternalLink www.pas56.com.
- Recovery_time_objective wikiPageExternalLink recovery_time_objective.php.
- Recovery_time_objective wikiPageID "3052981".
- Recovery_time_objective wikiPageLength "3067".
- Recovery_time_objective wikiPageOutDegree "13".
- Recovery_time_objective wikiPageRevisionID "698216953".
- Recovery_time_objective wikiPageWikiLink BS_25999.
- Recovery_time_objective wikiPageWikiLink Business_continuity.
- Recovery_time_objective wikiPageWikiLink Business_continuity_planning.
- Recovery_time_objective wikiPageWikiLink Business_process.
- Recovery_time_objective wikiPageWikiLink Category:Business_continuity_and_disaster_recovery.
- Recovery_time_objective wikiPageWikiLink Disaster_recovery.
- Recovery_time_objective wikiPageWikiLink IT_service_continuity.
- Recovery_time_objective wikiPageWikiLink Recovery_consistency_objective.
- Recovery_time_objective wikiPageWikiLink Recovery_point_objective.
- Recovery_time_objective wikiPageWikiLink Recovery_time_actual.
- Recovery_time_objective wikiPageWikiLink Strategic_planning.
- Recovery_time_objective wikiPageWikiLinkText "RTO".
- Recovery_time_objective wikiPageWikiLinkText "Recovery time objective".
- Recovery_time_objective wikiPageWikiLinkText "recovery time objective".
- Recovery_time_objective wikiPageUsesTemplate Template:Business-stub.
- Recovery_time_objective wikiPageUsesTemplate Template:Refimprove.
- Recovery_time_objective subject Category:Business_continuity_and_disaster_recovery.
- Recovery_time_objective hypernym Duration.
- Recovery_time_objective type Redirect.
- Recovery_time_objective comment "The recovery time objective (RTO) is the targeted duration of time and a service level within which a business process must be restored after a disaster (or disruption) in order to avoid unacceptable consequences associated with a break in business continuity.It can include the time for trying to fix the problem without a recovery, the recovery itself, testing, and the communication to the users.".
- Recovery_time_objective label "Recovery time objective".
- Recovery_time_objective sameAs Q1080590.
- Recovery_time_objective sameAs Tiempo_objetivo_de_recuperación.
- Recovery_time_objective sameAs Durxc3xa9e_maximale_dinterruption_admissible.
- Recovery_time_objective sameAs Recovery_Time_Objective.
- Recovery_time_objective sameAs m.08nc77.
- Recovery_time_objective sameAs Q1080590.
- Recovery_time_objective wasDerivedFrom Recovery_time_objective?oldid=698216953.
- Recovery_time_objective isPrimaryTopicOf Recovery_time_objective.