Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Rail_Splitter_Wind_Farm> ?p ?o }
Showing triples 1 to 44 of
44
with 100 triples per page.
- Rail_Splitter_Wind_Farm abstract "The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008-2009 at a cost of $200.0 million, was dedicated on July 21, 2009.".
- Rail_Splitter_Wind_Farm thumbnail Logan_County_wind_farm_from_US_136.jpg?width=300.
- Rail_Splitter_Wind_Farm wikiPageID "23492496".
- Rail_Splitter_Wind_Farm wikiPageLength "1570".
- Rail_Splitter_Wind_Farm wikiPageOutDegree "12".
- Rail_Splitter_Wind_Farm wikiPageRevisionID "629764067".
- Rail_Splitter_Wind_Farm wikiPageWikiLink Category:Buildings_and_structures_in_Logan_County,_Illinois.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Category:Buildings_and_structures_in_Tazewell_County,_Illinois.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Category:Energy_infrastructure_completed_in_2009.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Category:Wind_farms_in_Illinois.
- Rail_Splitter_Wind_Farm wikiPageWikiLink EDP_Renewables_North_America.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Emden,_Illinois.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Interstate_155_(Illinois).
- Rail_Splitter_Wind_Farm wikiPageWikiLink Logan_County,_Illinois.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Tazewell_County,_Illinois.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Watt.
- Rail_Splitter_Wind_Farm wikiPageWikiLink Wind_turbine.
- Rail_Splitter_Wind_Farm wikiPageWikiLink File:Logan_County_wind_farm_from_US_136.jpg.
- Rail_Splitter_Wind_Farm wikiPageWikiLinkText "Rail Splitter Wind Farm".
- Rail_Splitter_Wind_Farm wikiPageWikiLinkText "Rail Splitter".
- Rail_Splitter_Wind_Farm wikiPageUsesTemplate Template:Coord.
- Rail_Splitter_Wind_Farm wikiPageUsesTemplate Template:Reflist.
- Rail_Splitter_Wind_Farm wikiPageUsesTemplate Template:Wind-farm-stub.
- Rail_Splitter_Wind_Farm subject Category:Buildings_and_structures_in_Logan_County,_Illinois.
- Rail_Splitter_Wind_Farm subject Category:Buildings_and_structures_in_Tazewell_County,_Illinois.
- Rail_Splitter_Wind_Farm subject Category:Energy_infrastructure_completed_in_2009.
- Rail_Splitter_Wind_Farm subject Category:Wind_farms_in_Illinois.
- Rail_Splitter_Wind_Farm hypernym Farm.
- Rail_Splitter_Wind_Farm point "40.3 -89.4".
- Rail_Splitter_Wind_Farm type ArchitecturalStructure.
- Rail_Splitter_Wind_Farm type Station.
- Rail_Splitter_Wind_Farm type Farm.
- Rail_Splitter_Wind_Farm type Station.
- Rail_Splitter_Wind_Farm type SpatialThing.
- Rail_Splitter_Wind_Farm comment "The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008-2009 at a cost of $200.0 million, was dedicated on July 21, 2009.".
- Rail_Splitter_Wind_Farm label "Rail Splitter Wind Farm".
- Rail_Splitter_Wind_Farm sameAs Q7283914.
- Rail_Splitter_Wind_Farm sameAs m.06w48y0.
- Rail_Splitter_Wind_Farm sameAs Q7283914.
- Rail_Splitter_Wind_Farm lat "40.3".
- Rail_Splitter_Wind_Farm long "-89.4".
- Rail_Splitter_Wind_Farm wasDerivedFrom Rail_Splitter_Wind_Farm?oldid=629764067.
- Rail_Splitter_Wind_Farm depiction Logan_County_wind_farm_from_US_136.jpg.
- Rail_Splitter_Wind_Farm isPrimaryTopicOf Rail_Splitter_Wind_Farm.