Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Partial-order_planning> ?p ?o }
Showing triples 1 to 56 of
56
with 100 triples per page.
- Partial-order_planning abstract "Partial-order planning is an approach to automated planning that leaves decisions about the ordering of actions as open as possible. It contrasts with total-order planning, which produces an exact ordering of actions. Given a problem in which some sequence of actions is required in order to achieve a goal, a partial-order plan specifies all actions that need to be taken, but specifies an ordering of the actions only where necessary.Consider the following situation: a person must get from point A to point B. In between points A and B, there is an obstacle course. In a partial order plan, the specific path that this person will take to get from point A to point B will not be conceived of all at once. Instead the person will navigate the obstacle course by deciding which obstacles to master one at a time. Partial-order planning exhibits the Principle of Least Commitment, which contributes to the efficiency of this planning system as a whole. Often there are many possible plans for a problem which only differ in the order of the actions. Many traditional automated planners search for plans in the full search space containing all possible orders. In addition to the smaller search space for partial-order planning, it may also be advantageous to leave the option about the order of the actions open for later.An important distinction to be made is between ordering steps of an action and conceptualizing those steps. Partial order planning doesn’t sequence actions until it is absolutely necessary; however, these actions are conceived of much before they are sequenced. This type of planning system is simply a relation structure between actions. It is not the mechanism by which these actions mentally come to fruition.".
- Partial-order_planning wikiPageExternalLink partial-order-planner-fig-2.
- Partial-order_planning wikiPageExternalLink 1106.0249.pdf.
- Partial-order_planning wikiPageExternalLink download?rep=rep1&type=pdf&doi=10.1.1.50.8915.
- Partial-order_planning wikiPageExternalLink citation.cfm?id=1867345.
- Partial-order_planning wikiPageExternalLink pi.pdf.
- Partial-order_planning wikiPageExternalLink pop.html.
- Partial-order_planning wikiPageExternalLink decomposition_and_causality_in_partial_order_planning.pdf.
- Partial-order_planning wikiPageExternalLink partial_order_planning_evaluating_possible_efficiency_gains.pdf.
- Partial-order_planning wikiPageExternalLink Partial_Order.pdf.
- Partial-order_planning wikiPageExternalLink 06-planning4.pdf.
- Partial-order_planning wikiPageExternalLink kambhampati95-joint-aij.ps.
- Partial-order_planning wikiPageID "27395879".
- Partial-order_planning wikiPageLength "10108".
- Partial-order_planning wikiPageOutDegree "26".
- Partial-order_planning wikiPageRevisionID "701674730".
- Partial-order_planning wikiPageWikiLink Algorithm.
- Partial-order_planning wikiPageWikiLink Artificial_intelligence.
- Partial-order_planning wikiPageWikiLink Automated_planning_and_scheduling.
- Partial-order_planning wikiPageWikiLink Category:Automated_planning_and_scheduling.
- Partial-order_planning wikiPageWikiLink Computer_program.
- Partial-order_planning wikiPageWikiLink Demotion.
- Partial-order_planning wikiPageWikiLink Korf’s_taxonomy_of_subgoal_collections.
- Partial-order_planning wikiPageWikiLink Laboriously_serializable.
- Partial-order_planning wikiPageWikiLink Linear_extension.
- Partial-order_planning wikiPageWikiLink Nonserializable_subgoals.
- Partial-order_planning wikiPageWikiLink Orderings.
- Partial-order_planning wikiPageWikiLink Partially_ordered_set.
- Partial-order_planning wikiPageWikiLink Plan_space.
- Partial-order_planning wikiPageWikiLink Principle_of_Least_Commitment.
- Partial-order_planning wikiPageWikiLink Promotion_(rank).
- Partial-order_planning wikiPageWikiLink Reactive_planning.
- Partial-order_planning wikiPageWikiLink Search_algorithm.
- Partial-order_planning wikiPageWikiLink Sussman_Anomaly.
- Partial-order_planning wikiPageWikiLink Threat.
- Partial-order_planning wikiPageWikiLink Total-order_planning.
- Partial-order_planning wikiPageWikiLink Trivial_serializability.
- Partial-order_planning wikiPageWikiLink Trivial_serializability_facilitates.
- Partial-order_planning wikiPageWikiLinkText "Partial-order planning".
- Partial-order_planning wikiPageWikiLinkText "Partial-order planning#Partial-order Plan".
- Partial-order_planning wikiPageWikiLinkText "partial-order planning".
- Partial-order_planning wikiPageWikiLinkText "totally or partially ordered plan".
- Partial-order_planning wikiPageUsesTemplate Template:Compu-AI-stub.
- Partial-order_planning wikiPageUsesTemplate Template:Essay-like.
- Partial-order_planning wikiPageUsesTemplate Template:Multiple_issues.
- Partial-order_planning wikiPageUsesTemplate Template:No_footnotes.
- Partial-order_planning subject Category:Automated_planning_and_scheduling.
- Partial-order_planning hypernym Approach.
- Partial-order_planning type ProgrammingLanguage.
- Partial-order_planning comment "Partial-order planning is an approach to automated planning that leaves decisions about the ordering of actions as open as possible. It contrasts with total-order planning, which produces an exact ordering of actions.".
- Partial-order_planning label "Partial-order planning".
- Partial-order_planning sameAs Q7140353.
- Partial-order_planning sameAs m.0b__hj8.
- Partial-order_planning sameAs Q7140353.
- Partial-order_planning wasDerivedFrom Partial-order_planning?oldid=701674730.
- Partial-order_planning isPrimaryTopicOf Partial-order_planning.