Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Cerrón_Grande_Dam> ?p ?o }
Showing triples 1 to 100 of
100
with 100 triples per page.
- Cerrón_Grande_Dam length "0.8".
- Cerrón_Grande_Dam abstract "The Cerrón Grande Hydroelectric Dam (Spanish: Central Hidroeléctrica Cerrón Grande) spans the Lempa River 78 km north of San Salvador in the municipalities of Potonico, (Chalatenango) and Jutiapa (Cabañas) in El Salvador.The concrete gravity dam has a height of 90 m and a length of 800 m. The dam's reservoir has a surface area of 135 km² and a capacity of 2,180 million m³.The hydroelectric power plant was fitted with 2 x 67.5 MWe Francis turbines with a total capacity of 135 Mwe. Major maintenance work carried out between 2003-2007 included replacing the turbines with 2 x 85 MWe units with a total capacity of 170 MWe, which generate 488 GWh per year.".
- Cerrón_Grande_Dam height "90.0".
- Cerrón_Grande_Dam lake Cerrón_Grande_Dam__1.
- Cerrón_Grande_Dam length "800.0".
- Cerrón_Grande_Dam location Chalatenango_Department.
- Cerrón_Grande_Dam openingYear "1976".
- Cerrón_Grande_Dam part Cerrón_Grande_Dam__2.
- Cerrón_Grande_Dam river Lempa_River.
- Cerrón_Grande_Dam wikiPageID "22672937".
- Cerrón_Grande_Dam wikiPageLength "4107".
- Cerrón_Grande_Dam wikiPageOutDegree "20".
- Cerrón_Grande_Dam wikiPageRevisionID "681277130".
- Cerrón_Grande_Dam wikiPageWikiLink Cabañas_Department.
- Cerrón_Grande_Dam wikiPageWikiLink Category:Dams_completed_in_1976.
- Cerrón_Grande_Dam wikiPageWikiLink Category:Dams_in_El_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Category:Hydroelectric_power_stations_in_El_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Category:Lakes_of_El_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Category:Ramsar_sites_in_El_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Chalatenango_Department.
- Cerrón_Grande_Dam wikiPageWikiLink El_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Electricity_sector_in_El_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Francis_turbine.
- Cerrón_Grande_Dam wikiPageWikiLink Jutiapa,_Cabañas.
- Cerrón_Grande_Dam wikiPageWikiLink Kilowatt_hour.
- Cerrón_Grande_Dam wikiPageWikiLink Lempa_River.
- Cerrón_Grande_Dam wikiPageWikiLink Potonico.
- Cerrón_Grande_Dam wikiPageWikiLink Ramsar_Convention.
- Cerrón_Grande_Dam wikiPageWikiLink San_Salvador.
- Cerrón_Grande_Dam wikiPageWikiLink Watt.
- Cerrón_Grande_Dam wikiPageWikiLinkText "Cerrón Grande Dam".
- Cerrón_Grande_Dam wikiPageWikiLinkText "Cerrón Grande Dam#Cerrón Grande Lake".
- Cerrón_Grande_Dam wikiPageWikiLinkText "Cerrón Grande Hydroelectric Dam".
- Cerrón_Grande_Dam wikiPageWikiLinkText "Suchitlan Lake".
- Cerrón_Grande_Dam coordinatesDisplay "inline,title".
- Cerrón_Grande_Dam coordinatesType "type:landmark".
- Cerrón_Grande_Dam damCrosses Lempa_River.
- Cerrón_Grande_Dam damHeight "90 m".
- Cerrón_Grande_Dam damLength "800 m".
- Cerrón_Grande_Dam extra "--11-22".
- Cerrón_Grande_Dam latD "14".
- Cerrón_Grande_Dam latM "45".
- Cerrón_Grande_Dam latNs "N".
- Cerrón_Grande_Dam latS "40".
- Cerrón_Grande_Dam location "Chalatenango".
- Cerrón_Grande_Dam longD "90".
- Cerrón_Grande_Dam longEw "W".
- Cerrón_Grande_Dam longM "30".
- Cerrón_Grande_Dam longS "11".
- Cerrón_Grande_Dam name "Cerrón Grande Hydroelectric Dam".
- Cerrón_Grande_Dam nameOfficial "Central Hidroeléctrica Cerrón Grande".
- Cerrón_Grande_Dam opening "1976".
- Cerrón_Grande_Dam operator "CEL".
- Cerrón_Grande_Dam resCapacityTotal "2180000000".
- Cerrón_Grande_Dam resName "Embalse Cerrón Grande".
- Cerrón_Grande_Dam resSurface "135.0".
- Cerrón_Grande_Dam wikiPageUsesTemplate Template:Convert.
- Cerrón_Grande_Dam wikiPageUsesTemplate Template:Designation_list.
- Cerrón_Grande_Dam wikiPageUsesTemplate Template:ElSalvador-geo-stub.
- Cerrón_Grande_Dam wikiPageUsesTemplate Template:Infobox_dam.
- Cerrón_Grande_Dam wikiPageUsesTemplate Template:Reflist.
- Cerrón_Grande_Dam subject Category:Dams_completed_in_1976.
- Cerrón_Grande_Dam subject Category:Dams_in_El_Salvador.
- Cerrón_Grande_Dam subject Category:Hydroelectric_power_stations_in_El_Salvador.
- Cerrón_Grande_Dam subject Category:Lakes_of_El_Salvador.
- Cerrón_Grande_Dam subject Category:Ramsar_sites_in_El_Salvador.
- Cerrón_Grande_Dam point "14.761111111111111 -90.50305555555556".
- Cerrón_Grande_Dam type ArchitecturalStructure.
- Cerrón_Grande_Dam type Area.
- Cerrón_Grande_Dam type Dam.
- Cerrón_Grande_Dam type Infrastructure.
- Cerrón_Grande_Dam type Place.
- Cerrón_Grande_Dam type Station.
- Cerrón_Grande_Dam type Area.
- Cerrón_Grande_Dam type Attraction.
- Cerrón_Grande_Dam type Dam.
- Cerrón_Grande_Dam type Diacritic.
- Cerrón_Grande_Dam type Redirect.
- Cerrón_Grande_Dam type Site.
- Cerrón_Grande_Dam type Station.
- Cerrón_Grande_Dam type Location.
- Cerrón_Grande_Dam type Place.
- Cerrón_Grande_Dam type Thing.
- Cerrón_Grande_Dam type SpatialThing.
- Cerrón_Grande_Dam type Q12323.
- Cerrón_Grande_Dam comment "The Cerrón Grande Hydroelectric Dam (Spanish: Central Hidroeléctrica Cerrón Grande) spans the Lempa River 78 km north of San Salvador in the municipalities of Potonico, (Chalatenango) and Jutiapa (Cabañas) in El Salvador.The concrete gravity dam has a height of 90 m and a length of 800 m. The dam's reservoir has a surface area of 135 km² and a capacity of 2,180 million m³.The hydroelectric power plant was fitted with 2 x 67.5 MWe Francis turbines with a total capacity of 135 Mwe.".
- Cerrón_Grande_Dam label "Cerrón Grande Dam".
- Cerrón_Grande_Dam sameAs Q3433688.
- Cerrón_Grande_Dam sameAs Hidroeléctrica_Cerrón_Grande.
- Cerrón_Grande_Dam sameAs Central_hidroeléctrica_Cerrón_Grande.
- Cerrón_Grande_Dam sameAs Cerrón_Grande-demningen.
- Cerrón_Grande_Dam sameAs m.05zsgh5.
- Cerrón_Grande_Dam sameAs 3587105.
- Cerrón_Grande_Dam sameAs Q3433688.
- Cerrón_Grande_Dam lat "14.761111111111111".
- Cerrón_Grande_Dam long "-90.50305555555556".
- Cerrón_Grande_Dam wasDerivedFrom Cerrón_Grande_Dam?oldid=681277130.
- Cerrón_Grande_Dam isPrimaryTopicOf Cerrón_Grande_Dam.
- Cerrón_Grande_Dam name "Central Hidroeléctrica Cerrón Grande".
- Cerrón_Grande_Dam name "Cerrón Grande Hydroelectric Dam".