- Cedar_Creek_Wind_Farm abstract "The Cedar Creek Wind Farm is a 551.3MW, 397 wind turbine facility, consists of 2 phases, Cedar Creek I and Cedar Creek II, located 13 km (8 miles) east of Grover in north-central Weld County, Colorado, which became fully operational with the completion of Cedar Creek II in 2010. The initial 300.5 megawatt (MW) Cedar Creek I wind power installation was completed on time, within budget and without incident - with the operation commencing on 21 November 2007. Cedar Creek I is an important contributor to Colorado's New Energy Economy, providing enough wind-powered electricity for 81,135 homes. The power produced from the Cedar Creek wind farm is sold to the Public Service Company of Colorado. Cedar Creek II has an additional 250.8MW of generating capacity, and was commissioned in 2010.The first phase has 221 1MW wind turbines (produced by Mitsubishi Heavy Industries) and 53 1.5MW turbines (produced by General Electric), and the second phase has an additional 63 1.6MW SLE turbines from General Electric, and 60 2.5MW from German wind turbine supplier Nordex.The Cedar Creek Wind Farm I is owned by Cedar Creek Wind Energy LLC which is a conglomerate group with Infigen Energy owning 67% and BP Wind Energy the other 33%.The Cedar Creek Wind Farm II is owned by BP Wind Energy (50%) and Sempra Generation (50%). The power from the Cedar Creek 2 Wind Farm has been sold under a long-term power purchase agreement to the Public Service Company of Colorado, an Xcel Energy company. Electricity from the Cedar Creek II Wind Farm reaches the grid through approximately 20 miles of new transmission lines that connect to the Cedar Creek I Wind Farm. From there, the project utilizes an existing 76-mile (230kV) transmission line to deliver the electrical power. The Cedar Creek II project employed some 350 workers during peak construction, and some 19 jobs have been created to monitor and maintain the facility.".
- Cedar_Creek_Wind_Farm buildingStartDate "2007".
- Cedar_Creek_Wind_Farm buildingStartYear "2007".
- Cedar_Creek_Wind_Farm installedCapacity "5.513E8".
- Cedar_Creek_Wind_Farm location Colorado.
- Cedar_Creek_Wind_Farm openingDate "2007-11-21".
- Cedar_Creek_Wind_Farm openingYear "2007".
- Cedar_Creek_Wind_Farm status "Operational".
- Cedar_Creek_Wind_Farm wikiPageID "15136552".
- Cedar_Creek_Wind_Farm wikiPageLength "4966".
- Cedar_Creek_Wind_Farm wikiPageOutDegree "17".
- Cedar_Creek_Wind_Farm wikiPageRevisionID "684430503".
- Cedar_Creek_Wind_Farm wikiPageWikiLink Category:BP_buildings_and_structures.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Category:Buildings_and_structures_in_Weld_County,_Colorado.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Category:Energy_infrastructure_completed_in_2007.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Category:Energy_infrastructure_completed_in_2010.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Category:Wind_farms_in_Colorado.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Colorado.
- Cedar_Creek_Wind_Farm wikiPageWikiLink General_Electric.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Lists_of_wind_farms.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Mitsubishi_Heavy_Industries.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Power_purchase_agreement.
- Cedar_Creek_Wind_Farm wikiPageWikiLink United_States_dollar.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Weld_County,_Colorado.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Wind_farm.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Wind_power.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Wind_power_in_the_United_States.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Wind_turbine.
- Cedar_Creek_Wind_Farm wikiPageWikiLink Xcel_Energy.
- Cedar_Creek_Wind_Farm wikiPageWikiLinkText "Cedar Creek Wind Farm".
- Cedar_Creek_Wind_Farm wikiPageWikiLinkText "Cedar Creek Wind Farm#Cedar Creek I".
- Cedar_Creek_Wind_Farm wikiPageWikiLinkText "Cedar Creek Wind Farm#Cedar Creek II".
- Cedar_Creek_Wind_Farm wikiPageWikiLinkText "Cedar Creek".
- Cedar_Creek_Wind_Farm commissioned "2007-11-21".
- Cedar_Creek_Wind_Farm constructionBegan "2007".
- Cedar_Creek_Wind_Farm coordinatesDisplay "inline,title".
- Cedar_Creek_Wind_Farm coordinatesType "type:landmark_region:US-CO".
- Cedar_Creek_Wind_Farm cost "4.8E8".
- Cedar_Creek_Wind_Farm latD "40".
- Cedar_Creek_Wind_Farm latM "52".
- Cedar_Creek_Wind_Farm latNs "N".
- Cedar_Creek_Wind_Farm latS "16".
- Cedar_Creek_Wind_Farm location "13".
- Cedar_Creek_Wind_Farm locationMap "Colorado".
- Cedar_Creek_Wind_Farm longD "104".
- Cedar_Creek_Wind_Farm longEw "W".
- Cedar_Creek_Wind_Farm longM "5".
- Cedar_Creek_Wind_Farm longS "35".
- Cedar_Creek_Wind_Farm name "Cedar Creek Wind Farm I & II".
- Cedar_Creek_Wind_Farm operator "Infigen Energy and BP Wind Energy".
- Cedar_Creek_Wind_Farm owner "Cedar Creek Wind Energy, LLC".
- Cedar_Creek_Wind_Farm psElectricalCapacity "250.8".
- Cedar_Creek_Wind_Farm psElectricalCapacity "300.5".
- Cedar_Creek_Wind_Farm psElectricalCapacity "551.3".
- Cedar_Creek_Wind_Farm psUnitsManuModel "221".
- Cedar_Creek_Wind_Farm psUnitsManuModel "53".
- Cedar_Creek_Wind_Farm psUnitsManuModel "60".
- Cedar_Creek_Wind_Farm psUnitsManuModel "63".
- Cedar_Creek_Wind_Farm psUnitsManuModel "Mitsubishi, GE, Nordex".
- Cedar_Creek_Wind_Farm psUnitsOperational "123".
- Cedar_Creek_Wind_Farm psUnitsOperational "274".
- Cedar_Creek_Wind_Farm psUnitsOperational "397".
- Cedar_Creek_Wind_Farm status "Operational".
- Cedar_Creek_Wind_Farm wikiPageUsesTemplate Template:Citation_needed.
- Cedar_Creek_Wind_Farm wikiPageUsesTemplate Template:Infobox_power_station.
- Cedar_Creek_Wind_Farm wikiPageUsesTemplate Template:Reflist.
- Cedar_Creek_Wind_Farm wikiPageUsesTemplate Template:Wind_power_in_the_United_States.
- Cedar_Creek_Wind_Farm windFarmType "Onshore".
- Cedar_Creek_Wind_Farm windSiteElevation "1674m".
- Cedar_Creek_Wind_Farm subject Category:BP_buildings_and_structures.
- Cedar_Creek_Wind_Farm subject Category:Buildings_and_structures_in_Weld_County,_Colorado.
- Cedar_Creek_Wind_Farm subject Category:Energy_infrastructure_completed_in_2007.
- Cedar_Creek_Wind_Farm subject Category:Energy_infrastructure_completed_in_2010.
- Cedar_Creek_Wind_Farm subject Category:Wind_farms_in_Colorado.
- Cedar_Creek_Wind_Farm hypernym MW.
- Cedar_Creek_Wind_Farm point "40.87111111111111 -104.09305555555555".
- Cedar_Creek_Wind_Farm type ArchitecturalStructure.
- Cedar_Creek_Wind_Farm type Infrastructure.
- Cedar_Creek_Wind_Farm type Place.
- Cedar_Creek_Wind_Farm type PowerStation.
- Cedar_Creek_Wind_Farm type Station.
- Cedar_Creek_Wind_Farm type Farm.
- Cedar_Creek_Wind_Farm type Station.
- Cedar_Creek_Wind_Farm type Location.
- Cedar_Creek_Wind_Farm type Place.
- Cedar_Creek_Wind_Farm type Thing.
- Cedar_Creek_Wind_Farm type SpatialThing.
- Cedar_Creek_Wind_Farm type Q159719.
- Cedar_Creek_Wind_Farm comment "The Cedar Creek Wind Farm is a 551.3MW, 397 wind turbine facility, consists of 2 phases, Cedar Creek I and Cedar Creek II, located 13 km (8 miles) east of Grover in north-central Weld County, Colorado, which became fully operational with the completion of Cedar Creek II in 2010. The initial 300.5 megawatt (MW) Cedar Creek I wind power installation was completed on time, within budget and without incident - with the operation commencing on 21 November 2007.".
- Cedar_Creek_Wind_Farm label "Cedar Creek Wind Farm".
- Cedar_Creek_Wind_Farm sameAs Q5056650.
- Cedar_Creek_Wind_Farm sameAs Parc_éolien_de_Cedar_Creek.
- Cedar_Creek_Wind_Farm sameAs m.03hjpwr.
- Cedar_Creek_Wind_Farm sameAs Q5056650.
- Cedar_Creek_Wind_Farm lat "40.87111111111111".
- Cedar_Creek_Wind_Farm long "-104.09305555555555".
- Cedar_Creek_Wind_Farm wasDerivedFrom Cedar_Creek_Wind_Farm?oldid=684430503.
- Cedar_Creek_Wind_Farm isPrimaryTopicOf Cedar_Creek_Wind_Farm.
- Cedar_Creek_Wind_Farm name "Cedar Creek Wind Farm I & II".