Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Buffalo_Gap_Wind_Farm> ?p ?o }
Showing triples 1 to 76 of
76
with 100 triples per page.
- Buffalo_Gap_Wind_Farm abstract "The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 524 megawatts (MW).Buffalo Gap 1 consists of 67 Vestas V-80 wind turbines, each rated at 1.8 MW, for a total capacity of 120.6 MW. The wind farm was developed by SeaWest WindPower and is currently owned by AES Wind Generation. The power is sold to Direct Energy Texas under a 15-year power purchase agreement.Buffalo Gap 2 is a 232.5 MW expansion consisting of 155 GE 1.5 MW Wind Turbines. The facility was developed by AES Wind Generation and went into commercial operation in June 2007. The power is sold to Direct Energy under a 10-year power purchase agreement.Buffalo Gap 3 is a 170 MW addition, completed in September 2008, consisting of 74 Siemens 2.3 MW wind turbines.".
- Buffalo_Gap_Wind_Farm country United_States.
- Buffalo_Gap_Wind_Farm installedCapacity "5.24E8".
- Buffalo_Gap_Wind_Farm location Abilene,_Texas.
- Buffalo_Gap_Wind_Farm wikiPageExternalLink RenewableElectricityPlans.aspx.
- Buffalo_Gap_Wind_Farm wikiPageID "21754534".
- Buffalo_Gap_Wind_Farm wikiPageLength "3101".
- Buffalo_Gap_Wind_Farm wikiPageOutDegree "16".
- Buffalo_Gap_Wind_Farm wikiPageRevisionID "649428350".
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Abilene,_Texas.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Category:Buildings_and_structures_in_Nolan_County,_Texas.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Category:Buildings_and_structures_in_Taylor_County,_Texas.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Category:Energy_infrastructure_completed_in_2007.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Category:Energy_infrastructure_completed_in_2008.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Category:Wind_farms_in_Texas.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink GE_1.5_MW_Wind_Turbines.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink List_of_onshore_wind_farms.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Power_purchase_agreement.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink United_States.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Vestas.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Watt.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Wind_farm.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Wind_power.
- Buffalo_Gap_Wind_Farm wikiPageWikiLink Wind_turbine.
- Buffalo_Gap_Wind_Farm wikiPageWikiLinkText "Buffalo Gap Wind Farm".
- Buffalo_Gap_Wind_Farm wikiPageWikiLinkText "Buffalo Gap".
- Buffalo_Gap_Wind_Farm wikiPageWikiLinkText "SeaWest Wind Power".
- Buffalo_Gap_Wind_Farm coordinatesDisplay "inline,title".
- Buffalo_Gap_Wind_Farm coordinatesType "type:landmark_scale:10000_region:US".
- Buffalo_Gap_Wind_Farm country United_States.
- Buffalo_Gap_Wind_Farm latD "32".
- Buffalo_Gap_Wind_Farm latM "18".
- Buffalo_Gap_Wind_Farm latNs "N".
- Buffalo_Gap_Wind_Farm latS "38".
- Buffalo_Gap_Wind_Farm location "20".
- Buffalo_Gap_Wind_Farm locationMap "USA Texas".
- Buffalo_Gap_Wind_Farm longD "100".
- Buffalo_Gap_Wind_Farm longEw "W".
- Buffalo_Gap_Wind_Farm longM "8".
- Buffalo_Gap_Wind_Farm longS "57".
- Buffalo_Gap_Wind_Farm name "Buffalo Gap Wind Farm".
- Buffalo_Gap_Wind_Farm nameOfficial "Buffalo Gap Wind Farm".
- Buffalo_Gap_Wind_Farm owner "AES Wind Generation".
- Buffalo_Gap_Wind_Farm psElectricalCapacity "524.0".
- Buffalo_Gap_Wind_Farm wikiPageUsesTemplate Template:Convert.
- Buffalo_Gap_Wind_Farm wikiPageUsesTemplate Template:Infobox_power_station.
- Buffalo_Gap_Wind_Farm wikiPageUsesTemplate Template:Wind_power_in_the_United_States.
- Buffalo_Gap_Wind_Farm subject Category:Buildings_and_structures_in_Nolan_County,_Texas.
- Buffalo_Gap_Wind_Farm subject Category:Buildings_and_structures_in_Taylor_County,_Texas.
- Buffalo_Gap_Wind_Farm subject Category:Energy_infrastructure_completed_in_2007.
- Buffalo_Gap_Wind_Farm subject Category:Energy_infrastructure_completed_in_2008.
- Buffalo_Gap_Wind_Farm subject Category:Wind_farms_in_Texas.
- Buffalo_Gap_Wind_Farm point "32.31055555555555 -100.14916666666667".
- Buffalo_Gap_Wind_Farm type ArchitecturalStructure.
- Buffalo_Gap_Wind_Farm type Infrastructure.
- Buffalo_Gap_Wind_Farm type Place.
- Buffalo_Gap_Wind_Farm type PowerStation.
- Buffalo_Gap_Wind_Farm type Station.
- Buffalo_Gap_Wind_Farm type Farm.
- Buffalo_Gap_Wind_Farm type Station.
- Buffalo_Gap_Wind_Farm type Location.
- Buffalo_Gap_Wind_Farm type Place.
- Buffalo_Gap_Wind_Farm type Thing.
- Buffalo_Gap_Wind_Farm type SpatialThing.
- Buffalo_Gap_Wind_Farm type Q159719.
- Buffalo_Gap_Wind_Farm comment "The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 524 megawatts (MW).Buffalo Gap 1 consists of 67 Vestas V-80 wind turbines, each rated at 1.8 MW, for a total capacity of 120.6 MW. The wind farm was developed by SeaWest WindPower and is currently owned by AES Wind Generation.".
- Buffalo_Gap_Wind_Farm label "Buffalo Gap Wind Farm".
- Buffalo_Gap_Wind_Farm sameAs Q3068970.
- Buffalo_Gap_Wind_Farm sameAs Ferme_éolienne_de_Buffalo_Gap.
- Buffalo_Gap_Wind_Farm sameAs m.05mxdtl.
- Buffalo_Gap_Wind_Farm sameAs Q3068970.
- Buffalo_Gap_Wind_Farm lat "32.31055555555555".
- Buffalo_Gap_Wind_Farm long "-100.14916666666667".
- Buffalo_Gap_Wind_Farm wasDerivedFrom Buffalo_Gap_Wind_Farm?oldid=649428350.
- Buffalo_Gap_Wind_Farm isPrimaryTopicOf Buffalo_Gap_Wind_Farm.
- Buffalo_Gap_Wind_Farm name "Buffalo Gap Wind Farm".