Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Banner_County_Wind_Farm> ?p ?o }
Showing triples 1 to 33 of
33
with 100 triples per page.
- Banner_County_Wind_Farm abstract "The Banner County Wind Farm was a proposal by the Chicago-based Midwest Wind Energy company to construct a $60 million wind farm in Banner County, Nebraska. The 60,000 to 100,000 acre (24,000 to 40,000 ha) wind farm was intended to have 600 to 800 turbines and a peak capacity of 2,000 megawatts. The wind farm was intentionally designed to be big in order to force the construction of improved transmission lines. It was expected that it could take 10 years to complete the project.The wind farm was to be the largest in Nebraska, exceeding the size of Elkhorn Ridge, an 80 megawatt wind farm near Bloomfield, Nebraska, which began operation in March, 2009.".
- Banner_County_Wind_Farm wikiPageID "22458342".
- Banner_County_Wind_Farm wikiPageLength "1174".
- Banner_County_Wind_Farm wikiPageOutDegree "7".
- Banner_County_Wind_Farm wikiPageRevisionID "674915106".
- Banner_County_Wind_Farm wikiPageWikiLink Banner_County,_Nebraska.
- Banner_County_Wind_Farm wikiPageWikiLink Bloomfield,_Nebraska.
- Banner_County_Wind_Farm wikiPageWikiLink Category:Buildings_and_structures_in_Banner_County,_Nebraska.
- Banner_County_Wind_Farm wikiPageWikiLink Category:Proposed_wind_farms_in_the_United_States.
- Banner_County_Wind_Farm wikiPageWikiLink List_of_wind_farms_in_the_United_States.
- Banner_County_Wind_Farm wikiPageWikiLink Midwest_Wind_Energy.
- Banner_County_Wind_Farm wikiPageWikiLink Wind_power_in_the_United_States.
- Banner_County_Wind_Farm wikiPageWikiLinkText "Banner County Wind Farm".
- Banner_County_Wind_Farm wikiPageUsesTemplate Template:Coord.
- Banner_County_Wind_Farm wikiPageUsesTemplate Template:Wind_power_in_the_United_States.
- Banner_County_Wind_Farm subject Category:Buildings_and_structures_in_Banner_County,_Nebraska.
- Banner_County_Wind_Farm subject Category:Proposed_wind_farms_in_the_United_States.
- Banner_County_Wind_Farm hypernym Proposal.
- Banner_County_Wind_Farm point "41.53333333333333 -103.71666666666667".
- Banner_County_Wind_Farm type Aircraft.
- Banner_County_Wind_Farm type Station.
- Banner_County_Wind_Farm type Farm.
- Banner_County_Wind_Farm type Station.
- Banner_County_Wind_Farm type SpatialThing.
- Banner_County_Wind_Farm comment "The Banner County Wind Farm was a proposal by the Chicago-based Midwest Wind Energy company to construct a $60 million wind farm in Banner County, Nebraska. The 60,000 to 100,000 acre (24,000 to 40,000 ha) wind farm was intended to have 600 to 800 turbines and a peak capacity of 2,000 megawatts. The wind farm was intentionally designed to be big in order to force the construction of improved transmission lines.".
- Banner_County_Wind_Farm label "Banner County Wind Farm".
- Banner_County_Wind_Farm sameAs Q4856912.
- Banner_County_Wind_Farm sameAs m.05zrzt2.
- Banner_County_Wind_Farm sameAs Q4856912.
- Banner_County_Wind_Farm lat "41.53333333333333".
- Banner_County_Wind_Farm long "-103.71666666666667".
- Banner_County_Wind_Farm wasDerivedFrom Banner_County_Wind_Farm?oldid=674915106.
- Banner_County_Wind_Farm isPrimaryTopicOf Banner_County_Wind_Farm.