Matches in DBpedia 2016-04 for { <http://citation.dbpedia.org/hash/cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8> ?p ?o }
Showing triples 1 to 8 of
8
with 100 triples per page.
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 accessdate "2009-11-17".
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 date "2009-06-15".
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 isCitedBy Railway_electrification_in_Malaysia.
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 language "Malay".
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 newspaper Utusan_Malaysia.
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 page "15".
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 title "Projek landasan berkembar elektrik siap 25%".
- cf4c40f71d33b69a80a304d894360d335c94c25140dffa5fb5ea53a24880f1f8 transTitle "Double tracking and electrification project 25% complete".