Matches in DBpedia 2016-04 for { ?s ?p "Tucana (AK-88) was never commissioned and thus never bore the USS designation. She was transferred upon launching on 13 September 1944 to the U.S. Army as the U.S. Army Engineer Port Repair ship Arthur C. Ely."@en }
Showing triples 1 to 4 of
4
with 100 triples per page.
- Tucana_(AK-88) abstract "Tucana (AK-88) was never commissioned and thus never bore the USS designation. She was transferred upon launching on 13 September 1944 to the U.S. Army as the U.S. Army Engineer Port Repair ship Arthur C. Ely.".
- Q7850956 abstract "Tucana (AK-88) was never commissioned and thus never bore the USS designation. She was transferred upon launching on 13 September 1944 to the U.S. Army as the U.S. Army Engineer Port Repair ship Arthur C. Ely.".
- Tucana_(AK-88) comment "Tucana (AK-88) was never commissioned and thus never bore the USS designation. She was transferred upon launching on 13 September 1944 to the U.S. Army as the U.S. Army Engineer Port Repair ship Arthur C. Ely.".
- Q7850956 comment "Tucana (AK-88) was never commissioned and thus never bore the USS designation. She was transferred upon launching on 13 September 1944 to the U.S. Army as the U.S. Army Engineer Port Repair ship Arthur C. Ely.".