Matches in DBpedia 2016-04 for { ?s ?p "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016."@en }
Showing triples 1 to 2 of
2
with 100 triples per page.
- Reventazón_Dam comment "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016.".
- Q21159726 comment "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016.".