Matches in DBpedia 2015-04 for { <http://dbpedia.org/resource/Belo_Monte_Dam> ?p ?o }
- Belo_Monte_Dam abstract "The Belo Monte Dam (formerly known as Kararaô) is a hydroelectric dam complex currently under construction on the Xingu River in the state of Pará, Brazil. The planned installed capacity of the dam complex would be 11,233 megawatts (MW), which would make it the second-largest hydroelectric dam complex in Brazil and one of the world's largest in installed capacity, behind the Three Gorges Dam in China and the Brazilian-Paraguayan Itaipu Dam. Considering the oscillations of flow river, guaranteed minimum capacity generation from the Belo Monte Dam would measure 4,571 MW, 39% of its maximum capacity. Transmission lines would connect electricity generated by the dams' turbines to the main Brazilian power grid, which would distribute it throughout the country, both for residential and commercial consumption and to supply the growth of such industries as aluminium transformation and metallurgy. Brazil's rapid economic growth over the last decade has provoked a huge demand for new and stable sources of energy, especially to supply its growing industries. In Brazil, 46% of the energy consumed comes from renewable energy sources, and hydroelectric power plants produce over 85% of the electrical energy. The Government has decided to construct new hydroelectric dams to guarantee national energy security. However, there is opposition both within Brazil and among the international community to the project's potential construction regarding its economic viability, the generation efficiency of the dams and in particular its impacts on the region's people and environment. In addition, critics worry that construction of the Belo Monte Dam could make the construction of other dams upstream, which could have greater impacts, more viable.Plans for the dam began in 1975 but were soon shelved due to controversy; they were later revitalized in the late 1990s. In the 2000s, the dam was redesigned, but faced renewed controversy and (controversial) impact assessments were carried out. On 26 August 2010, a contract was signed with Norte Energia to construct the dam once the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) had issued an installation license. A partial installation license was granted on 26 January 2011 and a full license to construct the dam was issued on 1 June 2011. The licensing process and the dam's construction have been mired in federal court battles; the current ruling is that construction is allowed, because the license is based on five different environmental technical reports and in accordance with the RIMA (Environmental Impact Report, EIA-RIMA) study for Belo Monte. It is scheduled to be complete in 2019.".
- Belo_Monte_Dam description "Composite".
- Belo_Monte_Dam location Brazil.
- Belo_Monte_Dam location Pará.
- Belo_Monte_Dam openingYear "2019".
- Belo_Monte_Dam operator Eletronorte.
- Belo_Monte_Dam river Xingu_River.
- Belo_Monte_Dam status "Under construction".
- Belo_Monte_Dam wikiPageExternalLink belo-monte.com.
- Belo_Monte_Dam wikiPageExternalLink news-vs-news.
- Belo_Monte_Dam wikiPageExternalLink building_belo_monte.
- Belo_Monte_Dam wikiPageExternalLink index.php?page_number=99.
- Belo_Monte_Dam wikiPageExternalLink www.belomonte.gov.br.
- Belo_Monte_Dam wikiPageExternalLink 7472.
- Belo_Monte_Dam wikiPageExternalLink 21577073-having-spent-heavily-make-worlds-third-biggest-hydroelectric-project-greener-brazil.
- Belo_Monte_Dam wikiPageExternalLink main.asp?View=%7B46763BB8-3B05-432F-A206-C8F93CC3BA90%7D.
- Belo_Monte_Dam wikiPageExternalLink 5236.
- Belo_Monte_Dam wikiPageID "11204315".
- Belo_Monte_Dam wikiPageRevisionID "645765922".
- Belo_Monte_Dam coordinatesDisplay "inline,title".
- Belo_Monte_Dam coordinatesType "type:landmark".
- Belo_Monte_Dam cost "US$18.5 billion".
- Belo_Monte_Dam damCrosses Xingu_River.
- Belo_Monte_Dam damHeight "Bela Vista:".
- Belo_Monte_Dam damHeight "Belo Monte:".
- Belo_Monte_Dam damHeight "Pimental:".
- Belo_Monte_Dam damLength "Bela Vista:".
- Belo_Monte_Dam damLength "Belo Monte:".
- Belo_Monte_Dam damLength "Pimental:".
- Belo_Monte_Dam damOperator Eletronorte.
- Belo_Monte_Dam damType "Composite".
- Belo_Monte_Dam damVolume "Bela Vista:".
- Belo_Monte_Dam damVolume "Belo Monte and embankments:".
- Belo_Monte_Dam damVolume "Pimental:".
- Belo_Monte_Dam hasPhotoCollection Belo_Monte_Dam.
- Belo_Monte_Dam imageCaption "CGI rendition of the main dam, Belo Monte".
- Belo_Monte_Dam latD "3".
- Belo_Monte_Dam latM "6".
- Belo_Monte_Dam latNs "S".
- Belo_Monte_Dam latS "57".
- Belo_Monte_Dam location "Pará, Brazil".
- Belo_Monte_Dam locationMap "Brazil".
- Belo_Monte_Dam locationMapCaption "Location of the Belo Monte Dam in Brazil".
- Belo_Monte_Dam longD "51".
- Belo_Monte_Dam longEw "W".
- Belo_Monte_Dam longM "47".
- Belo_Monte_Dam longS "45".
- Belo_Monte_Dam name "Belo Monte Dam".
- Belo_Monte_Dam nameOfficial "Complexo Hidrelétrico Belo Monte".
- Belo_Monte_Dam opening "2019".
- Belo_Monte_Dam owner "Norte Energia, S.A.".
- Belo_Monte_Dam plantCapacity "11233.0".
- Belo_Monte_Dam plantCommission "2019".
- Belo_Monte_Dam plantHydraulicHead "Belo Monte:".
- Belo_Monte_Dam plantHydraulicHead "Pimental:".
- Belo_Monte_Dam plantOperator Eletronorte.
- Belo_Monte_Dam plantTurbines "Belo Monte: 20 x 550–611 MW Francis turbines".
- Belo_Monte_Dam plantTurbines "Pimental: 7 x 25.9 MW Kaplan bulb turbines".
- Belo_Monte_Dam resCapacityTotal "Calha Do Xingu:".
- Belo_Monte_Dam resCapacityTotal "Dos Canais:".
- Belo_Monte_Dam resName "Calha Do Xingu Reservoir".
- Belo_Monte_Dam resName "Dos Canais Reservoir".
- Belo_Monte_Dam resSurface "Calha Do Xingu:".
- Belo_Monte_Dam resSurface "Dos Canais:".
- Belo_Monte_Dam spillwayCapacity "Bela Vista:".
- Belo_Monte_Dam spillwayCapacity "Pimental:".
- Belo_Monte_Dam spillwayCount "2".
- Belo_Monte_Dam spillwayType "Bela Vista: 4 gates".
- Belo_Monte_Dam spillwayType "Pimental: 17 gates".
- Belo_Monte_Dam status "Under construction".
- Belo_Monte_Dam subject Category:Dam_controversies.
- Belo_Monte_Dam subject Category:Dams_in_Brazil.
- Belo_Monte_Dam subject Category:Dams_under_construction.
- Belo_Monte_Dam subject Category:Energy_infrastructure_under_construction.
- Belo_Monte_Dam subject Category:Hydroelectric_power_stations_in_Brazil.
- Belo_Monte_Dam subject Category:Proposed_hydroelectric_power_stations.
- Belo_Monte_Dam point "-3.1158333333333332 -51.795833333333334".
- Belo_Monte_Dam type Artifact100021939.
- Belo_Monte_Dam type Barrier102796623.
- Belo_Monte_Dam type Dam103160309.
- Belo_Monte_Dam type DamsInBrazil.
- Belo_Monte_Dam type DamsUnderConstruction.
- Belo_Monte_Dam type Facility103315023.
- Belo_Monte_Dam type HydroelectricPowerStationsInBrazil.
- Belo_Monte_Dam type Object100002684.
- Belo_Monte_Dam type Obstruction103839993.
- Belo_Monte_Dam type PhysicalEntity100001930.
- Belo_Monte_Dam type PowerStation103996655.
- Belo_Monte_Dam type ProposedHydroelectricPowerStations.
- Belo_Monte_Dam type Station104306080.
- Belo_Monte_Dam type Structure104341686.
- Belo_Monte_Dam type Whole100003553.
- Belo_Monte_Dam type YagoGeoEntity.
- Belo_Monte_Dam type YagoPermanentlyLocatedEntity.
- Belo_Monte_Dam type ArchitecturalStructure.
- Belo_Monte_Dam type Dam.
- Belo_Monte_Dam type Infrastructure.
- Belo_Monte_Dam type Place.
- Belo_Monte_Dam type Location.
- Belo_Monte_Dam type Place.