Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Rovigo_Photovoltaic_Power_Plant> ?p ?o }
Showing triples 1 to 79 of
79
with 100 triples per page.
- Rovigo_Photovoltaic_Power_Plant abstract "The Rovigo Photovoltaic Power Plant is a 70 MW solar photovoltaic (PV) plant in Northeast Italy. Construction of the plant was started in March 2010 and was completed in November 2010 at a cost of 276 million euro. When completed, it was the largest single-operating PV plant in Europe.The project, also called the San Bellino PV power plant, was developed by SunEdison and built by Isolux Corsán. In October 2010, SunEdison sold the project to infrastructure investor First Reserve for US$382 million, and remained responsible for operating and maintaining the plant.".
- Rovigo_Photovoltaic_Power_Plant buildingStartDate "March 2010".
- Rovigo_Photovoltaic_Power_Plant buildingStartYear "2010".
- Rovigo_Photovoltaic_Power_Plant country Italy.
- Rovigo_Photovoltaic_Power_Plant installedCapacity "7.0556E7".
- Rovigo_Photovoltaic_Power_Plant location San_Bellino.
- Rovigo_Photovoltaic_Power_Plant openingYear "2010".
- Rovigo_Photovoltaic_Power_Plant operator SunEdison.
- Rovigo_Photovoltaic_Power_Plant owner First_Reserve_Corporation.
- Rovigo_Photovoltaic_Power_Plant status "O".
- Rovigo_Photovoltaic_Power_Plant thumbnail San_Bellino_Solar_power_plant.jpg?width=300.
- Rovigo_Photovoltaic_Power_Plant wikiPageID "29729729".
- Rovigo_Photovoltaic_Power_Plant wikiPageLength "3783".
- Rovigo_Photovoltaic_Power_Plant wikiPageOutDegree "11".
- Rovigo_Photovoltaic_Power_Plant wikiPageRevisionID "649357086".
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Category:Photovoltaic_power_stations_in_Italy.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink First_Reserve.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink First_Reserve_Corporation.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Italy.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink List_of_photovoltaic_power_stations.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Megawatt.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Montalto_di_Castro_Photovoltaic_Power_Station.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Photovoltaic.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Photovoltaics.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink San_Bellino.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink SunEdison.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLink Watt.
- Rovigo_Photovoltaic_Power_Plant wikiPageWikiLinkText "Rovigo Photovoltaic Power Plant".
- Rovigo_Photovoltaic_Power_Plant commissioned "November 2010".
- Rovigo_Photovoltaic_Power_Plant constructionBegan "March 2010".
- Rovigo_Photovoltaic_Power_Plant coordinatesDisplay "inline,title".
- Rovigo_Photovoltaic_Power_Plant coordinatesType "type:landmark".
- Rovigo_Photovoltaic_Power_Plant cost "3.82E8".
- Rovigo_Photovoltaic_Power_Plant country Italy.
- Rovigo_Photovoltaic_Power_Plant hasPhotoCollection Rovigo_Photovoltaic_Power_Plant.
- Rovigo_Photovoltaic_Power_Plant latD "45".
- Rovigo_Photovoltaic_Power_Plant latM "2".
- Rovigo_Photovoltaic_Power_Plant latNs "N".
- Rovigo_Photovoltaic_Power_Plant latS "9".
- Rovigo_Photovoltaic_Power_Plant location San_Bellino.
- Rovigo_Photovoltaic_Power_Plant locationMap "Italy".
- Rovigo_Photovoltaic_Power_Plant longD "11".
- Rovigo_Photovoltaic_Power_Plant longEw "E".
- Rovigo_Photovoltaic_Power_Plant longM "34".
- Rovigo_Photovoltaic_Power_Plant longS "20".
- Rovigo_Photovoltaic_Power_Plant name "Rovigo Photovoltaic Power Plant".
- Rovigo_Photovoltaic_Power_Plant operator SunEdison.
- Rovigo_Photovoltaic_Power_Plant owner First_Reserve_Corporation.
- Rovigo_Photovoltaic_Power_Plant psElectricalCapacity "70.556".
- Rovigo_Photovoltaic_Power_Plant psUnitsOperational "280000".
- Rovigo_Photovoltaic_Power_Plant solarType "PV".
- Rovigo_Photovoltaic_Power_Plant status "O".
- Rovigo_Photovoltaic_Power_Plant wikiPageUsesTemplate Template:Clear.
- Rovigo_Photovoltaic_Power_Plant wikiPageUsesTemplate Template:Infobox_power_station.
- Rovigo_Photovoltaic_Power_Plant wikiPageUsesTemplate Template:Reflist.
- Rovigo_Photovoltaic_Power_Plant subject Category:Photovoltaic_power_stations_in_Italy.
- Rovigo_Photovoltaic_Power_Plant point "45.035833333333336 11.572222222222223".
- Rovigo_Photovoltaic_Power_Plant type ArchitecturalStructure.
- Rovigo_Photovoltaic_Power_Plant type Infrastructure.
- Rovigo_Photovoltaic_Power_Plant type Place.
- Rovigo_Photovoltaic_Power_Plant type PowerStation.
- Rovigo_Photovoltaic_Power_Plant type Station.
- Rovigo_Photovoltaic_Power_Plant type Station.
- Rovigo_Photovoltaic_Power_Plant type Location.
- Rovigo_Photovoltaic_Power_Plant type Place.
- Rovigo_Photovoltaic_Power_Plant type Thing.
- Rovigo_Photovoltaic_Power_Plant type SpatialThing.
- Rovigo_Photovoltaic_Power_Plant type Q159719.
- Rovigo_Photovoltaic_Power_Plant comment "The Rovigo Photovoltaic Power Plant is a 70 MW solar photovoltaic (PV) plant in Northeast Italy. Construction of the plant was started in March 2010 and was completed in November 2010 at a cost of 276 million euro. When completed, it was the largest single-operating PV plant in Europe.The project, also called the San Bellino PV power plant, was developed by SunEdison and built by Isolux Corsán.".
- Rovigo_Photovoltaic_Power_Plant label "Rovigo Photovoltaic Power Plant".
- Rovigo_Photovoltaic_Power_Plant sameAs m.0fq07m0.
- Rovigo_Photovoltaic_Power_Plant sameAs Q7371716.
- Rovigo_Photovoltaic_Power_Plant sameAs Q7371716.
- Rovigo_Photovoltaic_Power_Plant lat "45.035833333333336".
- Rovigo_Photovoltaic_Power_Plant long "11.572222222222223".
- Rovigo_Photovoltaic_Power_Plant wasDerivedFrom Rovigo_Photovoltaic_Power_Plant?oldid=649357086.
- Rovigo_Photovoltaic_Power_Plant depiction San_Bellino_Solar_power_plant.jpg.
- Rovigo_Photovoltaic_Power_Plant isPrimaryTopicOf Rovigo_Photovoltaic_Power_Plant.
- Rovigo_Photovoltaic_Power_Plant name "Rovigo Photovoltaic Power Plant".