Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Public_Performance_Measure> ?p ?o }
Showing triples 1 to 37 of
37
with 100 triples per page.
- Public_Performance_Measure abstract "The Public Performance Measure (PPM) is a measure of the punctuality and reliability of passenger trains in Britain. It is the percentage of scheduled trains which successfully run their entire planned route, calling at all timetabled stations, and arrive at their terminating station 'on time', where 'on time' means within five minutes of the scheduled destination arrival time for London and South East and regional operators (i.e. commuter services), or within ten minutes for long-distance operators.It is the industry standard measurement of performance, and has been used since 6 June 2000.The target for PPM varies each year and for each train operator, and is agreed with the Office of Rail Regulation. In October 2013 ORR said that, "Network Rail should... ensure that 92.5% of trains arrive on time nationally by 2019 (as measured using PPM), compared to 90.7% today."".
- Public_Performance_Measure wikiPageID "45668700".
- Public_Performance_Measure wikiPageLength "5310".
- Public_Performance_Measure wikiPageOutDegree "11".
- Public_Performance_Measure wikiPageRevisionID "676192481".
- Public_Performance_Measure wikiPageWikiLink Category:Department_for_Transport.
- Public_Performance_Measure wikiPageWikiLink Category:Network_Rail.
- Public_Performance_Measure wikiPageWikiLink Category:Transport_policy_in_the_United_Kingdom.
- Public_Performance_Measure wikiPageWikiLink Commuting.
- Public_Performance_Measure wikiPageWikiLink Gerry_Fiennes.
- Public_Performance_Measure wikiPageWikiLink Great_Britain.
- Public_Performance_Measure wikiPageWikiLink Office_of_Rail_Regulation.
- Public_Performance_Measure wikiPageWikiLink Office_of_Rail_and_Road.
- Public_Performance_Measure wikiPageWikiLink Percentage.
- Public_Performance_Measure wikiPageWikiLink Permanent_way_(history).
- Public_Performance_Measure wikiPageWikiLink Punctuality.
- Public_Performance_Measure wikiPageWikiLink Train.
- Public_Performance_Measure wikiPageWikiLink Trains.
- Public_Performance_Measure wikiPageWikiLinkText "% trains arriving within 5 mins of scheduled time".
- Public_Performance_Measure wikiPageWikiLinkText "PPM".
- Public_Performance_Measure wikiPageWikiLinkText "Performance".
- Public_Performance_Measure wikiPageWikiLinkText "Public Performance Measure".
- Public_Performance_Measure hasPhotoCollection Public_Performance_Measure.
- Public_Performance_Measure wikiPageUsesTemplate Template:Reflist.
- Public_Performance_Measure wikiPageUsesTemplate Template:UK-rail-transport-stub.
- Public_Performance_Measure subject Category:Department_for_Transport.
- Public_Performance_Measure subject Category:Network_Rail.
- Public_Performance_Measure subject Category:Transport_policy_in_the_United_Kingdom.
- Public_Performance_Measure hypernym Measure.
- Public_Performance_Measure type Work.
- Public_Performance_Measure comment "The Public Performance Measure (PPM) is a measure of the punctuality and reliability of passenger trains in Britain. It is the percentage of scheduled trains which successfully run their entire planned route, calling at all timetabled stations, and arrive at their terminating station 'on time', where 'on time' means within five minutes of the scheduled destination arrival time for London and South East and regional operators (i.e.".
- Public_Performance_Measure label "Public Performance Measure".
- Public_Performance_Measure sameAs m.0130d14c.
- Public_Performance_Measure sameAs Q19604514.
- Public_Performance_Measure sameAs Q19604514.
- Public_Performance_Measure wasDerivedFrom Public_Performance_Measure?oldid=676192481.
- Public_Performance_Measure isPrimaryTopicOf Public_Performance_Measure.