Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Pile_splice> ?p ?o }
Showing triples 1 to 33 of
33
with 100 triples per page.
- Pile_splice abstract "A pile splice joins two segments of a driven pile, using either a weld (typical for H beams), grout or mechanical means (typical for precast concrete piles). Pile splices enable the use of shorter segments, which allows for driving piles in low-headroom situations such as under bridges or inside buildings. Reducing length of pile segments to under ~65 feet long also means the trailers that haul them to job sites can stay within state length limits.".
- Pile_splice thumbnail Emeca3MinuteSplice.png?width=300.
- Pile_splice wikiPageID "37862823".
- Pile_splice wikiPageLength "1629".
- Pile_splice wikiPageOutDegree "12".
- Pile_splice wikiPageRevisionID "658925418".
- Pile_splice wikiPageWikiLink Category:Concrete.
- Pile_splice wikiPageWikiLink Category:Construction.
- Pile_splice wikiPageWikiLink Category:Foundations_(buildings_and_structures).
- Pile_splice wikiPageWikiLink Category:Geotechnical_engineering.
- Pile_splice wikiPageWikiLink Category:Structural_engineering.
- Pile_splice wikiPageWikiLink Deep_foundation.
- Pile_splice wikiPageWikiLink Grout.
- Pile_splice wikiPageWikiLink I-beam.
- Pile_splice wikiPageWikiLink Welding.
- Pile_splice wikiPageWikiLink File:Emeca3MinutePics.jpg.
- Pile_splice wikiPageWikiLink File:Emeca3MinuteSplice.png.
- Pile_splice wikiPageWikiLinkText "Pile splice".
- Pile_splice hasPhotoCollection Pile_splice.
- Pile_splice wikiPageUsesTemplate Template:Reflist.
- Pile_splice subject Category:Concrete.
- Pile_splice subject Category:Construction.
- Pile_splice subject Category:Foundations_(buildings_and_structures).
- Pile_splice subject Category:Geotechnical_engineering.
- Pile_splice subject Category:Structural_engineering.
- Pile_splice comment "A pile splice joins two segments of a driven pile, using either a weld (typical for H beams), grout or mechanical means (typical for precast concrete piles). Pile splices enable the use of shorter segments, which allows for driving piles in low-headroom situations such as under bridges or inside buildings. Reducing length of pile segments to under ~65 feet long also means the trailers that haul them to job sites can stay within state length limits.".
- Pile_splice label "Pile splice".
- Pile_splice sameAs m.0p76k__.
- Pile_splice sameAs Q7193851.
- Pile_splice sameAs Q7193851.
- Pile_splice wasDerivedFrom Pile_splice?oldid=658925418.
- Pile_splice depiction Emeca3MinuteSplice.png.
- Pile_splice isPrimaryTopicOf Pile_splice.