Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Northwest_Corridor_HOV/BRT> ?p ?o }
- BRT abstract "The Northwest Corridor HOV/BRT is a Georgia Department of Transportation (GDOT) plan to put HOV lanes and bus rapid transit along Interstate 75 and Interstate 575 in the northwestern suburbs of metro Atlanta. It would carry commuters between Atlanta and Cobb County, and beyond in Cherokee County, Georgia by adding two lanes for high-occupancy vehicles along I-75, with one continuing up a dedicated HOV exit onto I-575 to Sixes Road (mile 11, former exit 6), and the other straight on I-75 to Hickory Grove Road, just past Wade Green Road (mile 273, former exit 118). North of the highway interchange where they split, the new lanes would be put in the road median, between the existing northbound and southbound traffic. From the Perimeter (Interstate 285 on the northside) to I-575, the road has already been built with 12 to 16 lanes, which will require other plans, including via eminent domain.".
- BRT wikiPageExternalLink www.nwcproject.com.
- BRT wikiPageExternalLink www.nwhovbrt.com.
- BRT wikiPageID "2260006".
- BRT wikiPageLength "4677".
- BRT wikiPageOutDegree "57".
- BRT wikiPageRevisionID "647691540".
- BRT wikiPageWikiLink Alternative_transportation.
- BRT wikiPageWikiLink Atlanta.
- BRT wikiPageWikiLink Atlanta_metropolitan_area.
- BRT wikiPageWikiLink Bus.
- BRT wikiPageWikiLink Bus_rapid_transit.
- BRT wikiPageWikiLink Bus_station.
- BRT wikiPageWikiLink CSX.
- BRT wikiPageWikiLink CSX_Transportation.
- BRT wikiPageWikiLink Category:Bus_rapid_transit_in_Georgia_(U.S._state).
- BRT wikiPageWikiLink Category:Proposed_bus_rapid_transit_in_the_United_States.
- BRT wikiPageWikiLink Category:Proposed_public_transportation_in_Georgia_(U.S._state).
- BRT wikiPageWikiLink Category:Transportation_in_Cherokee_County,_Georgia.
- BRT wikiPageWikiLink Category:Transportation_in_Cobb_County,_Georgia.
- BRT wikiPageWikiLink Cherokee_County,_Georgia.
- BRT wikiPageWikiLink Cobb_Cloverleaf.
- BRT wikiPageWikiLink Cobb_County.
- BRT wikiPageWikiLink Cobb_County,_Georgia.
- BRT wikiPageWikiLink Commuter.
- BRT wikiPageWikiLink Commuter_rail.
- BRT wikiPageWikiLink Commuting.
- BRT wikiPageWikiLink Constitution_of_Georgia_(U.S._state).
- BRT wikiPageWikiLink Construction.
- BRT wikiPageWikiLink Contraflow_lane.
- BRT wikiPageWikiLink Emergency_lane.
- BRT wikiPageWikiLink Eminent_domain.
- BRT wikiPageWikiLink Freight_train.
- BRT wikiPageWikiLink Fuel_tax.
- BRT wikiPageWikiLink GDOT.
- BRT wikiPageWikiLink Gasoline_tax.
- BRT wikiPageWikiLink Georgia_(U.S._state).
- BRT wikiPageWikiLink Georgia_Department_of_Transportation.
- BRT wikiPageWikiLink Georgia_Northeastern_Railroad.
- BRT wikiPageWikiLink HOV_lane.
- BRT wikiPageWikiLink High-occupancy_vehicle_lane.
- BRT wikiPageWikiLink Highway_interchange.
- BRT wikiPageWikiLink Interchange_(road).
- BRT wikiPageWikiLink Interstate_285.
- BRT wikiPageWikiLink Interstate_575.
- BRT wikiPageWikiLink Interstate_75.
- BRT wikiPageWikiLink Jersey_barrier.
- BRT wikiPageWikiLink Light_rail.
- BRT wikiPageWikiLink Median_strip.
- BRT wikiPageWikiLink Metro_Atlanta.
- BRT wikiPageWikiLink Money.
- BRT wikiPageWikiLink Natural_gas.
- BRT wikiPageWikiLink Overhead_line.
- BRT wikiPageWikiLink Overhead_lines.
- BRT wikiPageWikiLink Park-and-ride.
- BRT wikiPageWikiLink Park_and_ride.
- BRT wikiPageWikiLink Parking_lot.
- BRT wikiPageWikiLink Plan.
- BRT wikiPageWikiLink Rail_freight_transport.
- BRT wikiPageWikiLink Rail_track.
- BRT wikiPageWikiLink Reversible_lane.
- BRT wikiPageWikiLink Road.
- BRT wikiPageWikiLink Road_median.
- BRT wikiPageWikiLink Rush_hour.
- BRT wikiPageWikiLink Shoulder_(road).
- BRT wikiPageWikiLink Subsidy.
- BRT wikiPageWikiLink Suburb.
- BRT wikiPageWikiLink Sustainable_transport.
- BRT wikiPageWikiLink Track_(rail_transport).
- BRT wikiPageWikiLink Traffic.
- BRT wikiPageWikiLink Train.
- BRT wikiPageWikiLink Trolley_buses_in_Vancouver.
- BRT wikiPageWikiLink Trolleybus.
- BRT wikiPageWikiLink Trolleybuses_in_Seattle.
- BRT wikiPageWikiLink Trolleybuses_in_Vancouver.
- BRT wikiPageWikiLink Truck.
- BRT wikiPageWikiLink Tunnel.
- BRT wikiPageWikiLink Underpass.
- BRT wikiPageWikiLink Vehicle.
- BRT wikiPageWikiLink Western_&_Atlantic_Railroad.
- BRT wikiPageWikiLink Western_and_Atlantic_Railroad.
- BRT wikiPageWikiLinkText "Northwest Corridor HOV/BRT".
- BRT hasPhotoCollection BRT.
- BRT wikiPageUsesTemplate Template:Reflist.
- BRT wikiPageUsesTemplate Template:Unreferenced.
- BRT subject Category:Bus_rapid_transit_in_Georgia_(U.S._state).
- BRT subject Category:Proposed_bus_rapid_transit_in_the_United_States.
- BRT subject Category:Proposed_public_transportation_in_Georgia_(U.S._state).
- BRT subject Category:Transportation_in_Cherokee_County,_Georgia.
- BRT subject Category:Transportation_in_Cobb_County,_Georgia.
- BRT hypernym Department.
- BRT type Article.
- BRT type Settlement.
- BRT type Article.
- BRT comment "The Northwest Corridor HOV/BRT is a Georgia Department of Transportation (GDOT) plan to put HOV lanes and bus rapid transit along Interstate 75 and Interstate 575 in the northwestern suburbs of metro Atlanta.".
- BRT label "Northwest Corridor HOV/BRT".
- BRT sameAs m.06zzr6.
- BRT sameAs Q7060010.
- BRT sameAs Q7060010.
- BRT wasDerivedFrom BRT?oldid=647691540.