Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Hammock_activity> ?p ?o }
Showing triples 1 to 31 of
31
with 100 triples per page.
- Hammock_activity abstract "A hammock activity (also hammock task) is a schedule or project planning term for a grouping of tasks that "hang" between two end dates it is tied to.A hammock activity can group tasks which are not related in the hierarchical sense of a Work Breakdown Structure, or are not related in a logical sense of a task dependency where one task must wait for another. Usages include: Group dissimilar activities that lead to an overall capability, such as preparations under a summary label, e.g. "vacation preparation"; Group unrelated items for the purpose of a summary such as a calendar-based reporting period, e.g. "First quarter plans"; Group ongoing or overhead activities that run the length of an effort, e.g. "project management"The duration of the hammock activity (the size of the hammock) may also be set by the subtasks within it, so that the abstract grouping has a start date of the earliest of any of the subtasks and the finish date is the latest of any of the contents.A hammock activity is regarded as a form of Summary activity that is similar to but different from a Level of Effort (LOE) activity. Use of hammock activities is also a way to simplify the difficulties of performing Work Breakdown Structure decomposition to low levels.".
- Hammock_activity wikiPageExternalLink default.aspx?scid=kb;en-us;141733&Product=PRJ2K.
- Hammock_activity wikiPageExternalLink PMG_H00.htm.
- Hammock_activity wikiPageExternalLink 5590b.aspx.
- Hammock_activity wikiPageID "8980531".
- Hammock_activity wikiPageLength "3265".
- Hammock_activity wikiPageOutDegree "7".
- Hammock_activity wikiPageRevisionID "616263305".
- Hammock_activity wikiPageWikiLink Category:Project_management.
- Hammock_activity wikiPageWikiLink Dependency_(project_management).
- Hammock_activity wikiPageWikiLink Level_of_Effort.
- Hammock_activity wikiPageWikiLink Project_planning.
- Hammock_activity wikiPageWikiLink Schedule_(project_management).
- Hammock_activity wikiPageWikiLink Work_Breakdown_Structure.
- Hammock_activity wikiPageWikiLink Work_breakdown_structure.
- Hammock_activity wikiPageWikiLinkText "Hammock activity".
- Hammock_activity hasPhotoCollection Hammock_activity.
- Hammock_activity wikiPageUsesTemplate Template:Reflist.
- Hammock_activity subject Category:Project_management.
- Hammock_activity hypernym Schedule.
- Hammock_activity type Article.
- Hammock_activity type Company.
- Hammock_activity type Article.
- Hammock_activity comment "A hammock activity (also hammock task) is a schedule or project planning term for a grouping of tasks that "hang" between two end dates it is tied to.A hammock activity can group tasks which are not related in the hierarchical sense of a Work Breakdown Structure, or are not related in a logical sense of a task dependency where one task must wait for another. Usages include: Group dissimilar activities that lead to an overall capability, such as preparations under a summary label, e.g.".
- Hammock_activity label "Hammock activity".
- Hammock_activity sameAs Hammock.
- Hammock_activity sameAs m.027s3l5.
- Hammock_activity sameAs Q5645810.
- Hammock_activity sameAs Q5645810.
- Hammock_activity wasDerivedFrom Hammock_activity?oldid=616263305.
- Hammock_activity isPrimaryTopicOf Hammock_activity.