Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Beijing_Subway_rolling_stock> ?p ?o }
Showing triples 1 to 52 of
52
with 100 triples per page.
- Beijing_Subway_rolling_stock abstract "All Beijing Subway trains run on 1,435mm standard gauge rail and draw power from the 750 V DC third rail, except those on Lines 6 and 14, which use 1,500 V DC overhead wires. Lines 6, 15, Fangshan, and Changping have a designed maximum service speed of 100 km/h. The Airport Line is linear motor driven with a designed maximum service speed of 110 km/h All other Lines have a maximum service speed of 80 km/h. Currently Lines 1, 2, 4, 5, 8, 9, 10, 13, 15, Batong, Daxing, Changping, Fangshan, and Yizhuang use 6 car B size trains. Initially, Lines Batong and 13 was originally used 4 car trains and now expanded into six.".
- Beijing_Subway_rolling_stock thumbnail 北京地铁15号线列车.JPG?width=300.
- Beijing_Subway_rolling_stock wikiPageExternalLink beijing.html.
- Beijing_Subway_rolling_stock wikiPageExternalLink www.bjsubway.com.
- Beijing_Subway_rolling_stock wikiPageID "26742931".
- Beijing_Subway_rolling_stock wikiPageLength "9613".
- Beijing_Subway_rolling_stock wikiPageOutDegree "24".
- Beijing_Subway_rolling_stock wikiPageRevisionID "676322361".
- Beijing_Subway_rolling_stock wikiPageWikiLink Beijing_Mass_Transit_Railway_Operation_Corporation_Limited.
- Beijing_Subway_rolling_stock wikiPageWikiLink Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink Beijing_Subway_Rolling_Stock_Equipment_Co._Ltd..
- Beijing_Subway_rolling_stock wikiPageWikiLink Bombardier_Advanced_Rapid_Transit.
- Beijing_Subway_rolling_stock wikiPageWikiLink Bombardier_Innovia_Metro.
- Beijing_Subway_rolling_stock wikiPageWikiLink Bombardier_Transportation.
- Beijing_Subway_rolling_stock wikiPageWikiLink CSR_Corporation_Limited.
- Beijing_Subway_rolling_stock wikiPageWikiLink CSR_Sifang_Co_Ltd..
- Beijing_Subway_rolling_stock wikiPageWikiLink Category:Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink Changchun_Railway_Vehicles.
- Beijing_Subway_rolling_stock wikiPageWikiLink Changping_Line,_Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink China_CNR_Corporation.
- Beijing_Subway_rolling_stock wikiPageWikiLink China_South_Locomotive_and_Rolling_Stock_Industry_(Group)_Corporation.
- Beijing_Subway_rolling_stock wikiPageWikiLink Daxing_Line,_Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink Direct_current.
- Beijing_Subway_rolling_stock wikiPageWikiLink Japan_Transport_Engineering_Company.
- Beijing_Subway_rolling_stock wikiPageWikiLink Line_15,_Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink Line_2,_Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink Line_6,_Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageWikiLink Sifang_Locomotive_and_Rolling_Stock_Company.
- Beijing_Subway_rolling_stock wikiPageWikiLink Standard_gauge.
- Beijing_Subway_rolling_stock wikiPageWikiLink Third_rail.
- Beijing_Subway_rolling_stock wikiPageWikiLink Tokyu_Car_Corporation.
- Beijing_Subway_rolling_stock wikiPageWikiLink Variable-frequency_drive.
- Beijing_Subway_rolling_stock wikiPageWikiLink Volt.
- Beijing_Subway_rolling_stock wikiPageWikiLink File:Beijing_Subway_Airport_Express_01.jpg.
- Beijing_Subway_rolling_stock wikiPageWikiLinkText "Beijing Subway rolling stock".
- Beijing_Subway_rolling_stock wikiPageWikiLinkText "rolling stock".
- Beijing_Subway_rolling_stock hasPhotoCollection Beijing_Subway_rolling_stock.
- Beijing_Subway_rolling_stock wikiPageUsesTemplate Template:Beijing_Subway.
- Beijing_Subway_rolling_stock wikiPageUsesTemplate Template:Commonscat.
- Beijing_Subway_rolling_stock wikiPageUsesTemplate Template:Multiple_images.
- Beijing_Subway_rolling_stock wikiPageUsesTemplate Template:Rapid_transit_in_the_Peoples_Republic_of_China.
- Beijing_Subway_rolling_stock subject Category:Beijing_Subway.
- Beijing_Subway_rolling_stock comment "All Beijing Subway trains run on 1,435mm standard gauge rail and draw power from the 750 V DC third rail, except those on Lines 6 and 14, which use 1,500 V DC overhead wires. Lines 6, 15, Fangshan, and Changping have a designed maximum service speed of 100 km/h. The Airport Line is linear motor driven with a designed maximum service speed of 110 km/h All other Lines have a maximum service speed of 80 km/h.".
- Beijing_Subway_rolling_stock label "Beijing Subway rolling stock".
- Beijing_Subway_rolling_stock sameAs ล้อขับเคลื่อนของรถไฟใต้ดินปักกิ่ง.
- Beijing_Subway_rolling_stock sameAs Q4881192.
- Beijing_Subway_rolling_stock sameAs Q4881192.
- Beijing_Subway_rolling_stock sameAs 北京地铁车辆.
- Beijing_Subway_rolling_stock wasDerivedFrom Beijing_Subway_rolling_stock?oldid=676322361.
- Beijing_Subway_rolling_stock depiction 北京地铁15号线列车.JPG.
- Beijing_Subway_rolling_stock homepage www.bjsubway.com.
- Beijing_Subway_rolling_stock isPrimaryTopicOf Beijing_Subway_rolling_stock.