Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Barnard_River_Scheme> ?p ?o }
Showing triples 1 to 33 of
33
with 100 triples per page.
- Barnard_River_Scheme abstract "The Barnard River Scheme is an inter-basin water transfer system in New South Wales, which can transfer water from the Barnard River in the upper Manning River catchment over the Mount Royal Range into the Hunter River.The scheme was constructed between 1983 and 1985, to provide drought relief water for Bayswater Power Station which was being constructed at the same time.The scheme consists of: a weir on the Barnard River, which transfers water into a small dam on Orham Creek via a gravity channel a pair of pumping stations which pump the water through pipelines to Bralga Tops another pipeline feeding downhill into Oaky Creek, which is a tributary of the Hunter River.".
- Barnard_River_Scheme wikiPageExternalLink www.environment.nsw.gov.au.
- Barnard_River_Scheme wikiPageExternalLink default.aspx.
- Barnard_River_Scheme wikiPageID "5999624".
- Barnard_River_Scheme wikiPageLength "1148".
- Barnard_River_Scheme wikiPageOutDegree "10".
- Barnard_River_Scheme wikiPageRevisionID "522979472".
- Barnard_River_Scheme wikiPageWikiLink Barnard_River.
- Barnard_River_Scheme wikiPageWikiLink Bayswater_Power_Station.
- Barnard_River_Scheme wikiPageWikiLink Category:Geography_of_New_South_Wales.
- Barnard_River_Scheme wikiPageWikiLink Category:Interbasin_transfer.
- Barnard_River_Scheme wikiPageWikiLink Category:Irrigation_in_Australia.
- Barnard_River_Scheme wikiPageWikiLink Drought.
- Barnard_River_Scheme wikiPageWikiLink Drought_relief.
- Barnard_River_Scheme wikiPageWikiLink Hunter_River.
- Barnard_River_Scheme wikiPageWikiLink Hunter_River_(New_South_Wales).
- Barnard_River_Scheme wikiPageWikiLink Manning_River.
- Barnard_River_Scheme wikiPageWikiLink Mount_Royal_Range.
- Barnard_River_Scheme wikiPageWikiLink New_South_Wales.
- Barnard_River_Scheme wikiPageWikiLinkText "Barnard River Scheme".
- Barnard_River_Scheme hasPhotoCollection Barnard_River_Scheme.
- Barnard_River_Scheme wikiPageUsesTemplate Template:Reflist.
- Barnard_River_Scheme subject Category:Geography_of_New_South_Wales.
- Barnard_River_Scheme subject Category:Interbasin_transfer.
- Barnard_River_Scheme subject Category:Irrigation_in_Australia.
- Barnard_River_Scheme hypernym System.
- Barnard_River_Scheme comment "The Barnard River Scheme is an inter-basin water transfer system in New South Wales, which can transfer water from the Barnard River in the upper Manning River catchment over the Mount Royal Range into the Hunter River.The scheme was constructed between 1983 and 1985, to provide drought relief water for Bayswater Power Station which was being constructed at the same time.The scheme consists of: a weir on the Barnard River, which transfers water into a small dam on Orham Creek via a gravity channel a pair of pumping stations which pump the water through pipelines to Bralga Tops another pipeline feeding downhill into Oaky Creek, which is a tributary of the Hunter River.".
- Barnard_River_Scheme label "Barnard River Scheme".
- Barnard_River_Scheme sameAs m.0fjyhx.
- Barnard_River_Scheme sameAs Q4861435.
- Barnard_River_Scheme sameAs Q4861435.
- Barnard_River_Scheme wasDerivedFrom Barnard_River_Scheme?oldid=522979472.
- Barnard_River_Scheme isPrimaryTopicOf Barnard_River_Scheme.