Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Tritium_Systems_Test_Assembly_(TSTA)> ?p ?o }
Showing triples 1 to 25 of
25
with 100 triples per page.
- Tritium_Systems_Test_Assembly_(TSTA) abstract "The Tritium Systems Test Assembly (TSTA) was a facility at Los Alamos National Laboratory dedicated to the development and demonstration of technologies required for fusion-relevant Deuterium-Tritium processing. The facility design was launched in 1977. It was commissioned in 1982 and first tritium was processed in 1984. The maximum tritium inventory was 140 grams. Many publications were generated during this project. Some publications are available at: [1]".
- Tritium_Systems_Test_Assembly_(TSTA) thumbnail TSTA_Building.jpg?width=300.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageExternalLink TSTA%20Publications.htm.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageID "19079107".
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageLength "2207".
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageOutDegree "5".
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageRevisionID "692581150".
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageWikiLink Category:Los_Alamos_National_Laboratory.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageWikiLink Los_Alamos_National_Laboratory.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageWikiLink Tritium.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageWikiLink File:TSTA_Building.jpg.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageWikiLink File:Tsta.jpg.
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageWikiLinkText "Tritium Systems Test Assembly (TSTA)".
- Tritium_Systems_Test_Assembly_(TSTA) wikiPageUsesTemplate Template:Reflist.
- Tritium_Systems_Test_Assembly_(TSTA) subject Category:Los_Alamos_National_Laboratory.
- Tritium_Systems_Test_Assembly_(TSTA) hypernym Facility.
- Tritium_Systems_Test_Assembly_(TSTA) type ArchitecturalStructure.
- Tritium_Systems_Test_Assembly_(TSTA) comment "The Tritium Systems Test Assembly (TSTA) was a facility at Los Alamos National Laboratory dedicated to the development and demonstration of technologies required for fusion-relevant Deuterium-Tritium processing. The facility design was launched in 1977. It was commissioned in 1982 and first tritium was processed in 1984. The maximum tritium inventory was 140 grams. Many publications were generated during this project. Some publications are available at: [1]".
- Tritium_Systems_Test_Assembly_(TSTA) label "Tritium Systems Test Assembly (TSTA)".
- Tritium_Systems_Test_Assembly_(TSTA) sameAs Q7844298.
- Tritium_Systems_Test_Assembly_(TSTA) sameAs m.04jjrj3.
- Tritium_Systems_Test_Assembly_(TSTA) sameAs Q7844298.
- Tritium_Systems_Test_Assembly_(TSTA) wasDerivedFrom Tritium_Systems_Test_Assembly_(TSTA)?oldid=692581150.
- Tritium_Systems_Test_Assembly_(TSTA) depiction TSTA_Building.jpg.
- Tritium_Systems_Test_Assembly_(TSTA) isPrimaryTopicOf Tritium_Systems_Test_Assembly_(TSTA).