Matches in DBpedia 2016-04 for { ?s ?p "USS Terry (DD-513), a Fletcher-class destroyer, was the second ship of the United States Navy to be named for Commander Edward Terry (1839–1882).Terry was laid down at Bath, Maine, on 8 June 1942 by the Bath Iron Works; launched on 22 November 1942; sponsored by Mrs. Charles Nagel, Jr., and commissioned at the Boston Navy Yard on 26 January 1943, Commander George R. Phelan in command."@en }
Showing triples 1 to 4 of
4
with 100 triples per page.
- USS_Terry_(DD-513) abstract "USS Terry (DD-513), a Fletcher-class destroyer, was the second ship of the United States Navy to be named for Commander Edward Terry (1839–1882).Terry was laid down at Bath, Maine, on 8 June 1942 by the Bath Iron Works; launched on 22 November 1942; sponsored by Mrs. Charles Nagel, Jr., and commissioned at the Boston Navy Yard on 26 January 1943, Commander George R. Phelan in command.".
- Q7874689 abstract "USS Terry (DD-513), a Fletcher-class destroyer, was the second ship of the United States Navy to be named for Commander Edward Terry (1839–1882).Terry was laid down at Bath, Maine, on 8 June 1942 by the Bath Iron Works; launched on 22 November 1942; sponsored by Mrs. Charles Nagel, Jr., and commissioned at the Boston Navy Yard on 26 January 1943, Commander George R. Phelan in command.".
- USS_Terry_(DD-513) comment "USS Terry (DD-513), a Fletcher-class destroyer, was the second ship of the United States Navy to be named for Commander Edward Terry (1839–1882).Terry was laid down at Bath, Maine, on 8 June 1942 by the Bath Iron Works; launched on 22 November 1942; sponsored by Mrs. Charles Nagel, Jr., and commissioned at the Boston Navy Yard on 26 January 1943, Commander George R. Phelan in command.".
- Q7874689 comment "USS Terry (DD-513), a Fletcher-class destroyer, was the second ship of the United States Navy to be named for Commander Edward Terry (1839–1882).Terry was laid down at Bath, Maine, on 8 June 1942 by the Bath Iron Works; launched on 22 November 1942; sponsored by Mrs. Charles Nagel, Jr., and commissioned at the Boston Navy Yard on 26 January 1943, Commander George R. Phelan in command.".