Matches in DBpedia 2016-04 for { ?s ?p "The Three Bridges to Tunbridge Wells Central Line was a railway line running from Three Bridges (on the Brighton Main Line) in West Sussex to Tunbridge Wells Central in Kent via East Grinstead in East Sussex, a distance of 20 miles 74 chains (33.7 km). Opened in 1855, the main section of the line was a casualty of the Beeching Axe – the last train ran on 1 January 1967. The remaining section to Tunbridge Wells closed on 6 July 1985, although the section between Groombridge and Tunbridge Wells West was reopened in 1997 under the auspices of the Spa Valley Railway."@en }
Showing triples 1 to 2 of
2
with 100 triples per page.
- Three_Bridges_to_Tunbridge_Wells_Central_Line abstract "The Three Bridges to Tunbridge Wells Central Line was a railway line running from Three Bridges (on the Brighton Main Line) in West Sussex to Tunbridge Wells Central in Kent via East Grinstead in East Sussex, a distance of 20 miles 74 chains (33.7 km). Opened in 1855, the main section of the line was a casualty of the Beeching Axe – the last train ran on 1 January 1967. The remaining section to Tunbridge Wells closed on 6 July 1985, although the section between Groombridge and Tunbridge Wells West was reopened in 1997 under the auspices of the Spa Valley Railway.".
- Q7797355 abstract "The Three Bridges to Tunbridge Wells Central Line was a railway line running from Three Bridges (on the Brighton Main Line) in West Sussex to Tunbridge Wells Central in Kent via East Grinstead in East Sussex, a distance of 20 miles 74 chains (33.7 km). Opened in 1855, the main section of the line was a casualty of the Beeching Axe – the last train ran on 1 January 1967. The remaining section to Tunbridge Wells closed on 6 July 1985, although the section between Groombridge and Tunbridge Wells West was reopened in 1997 under the auspices of the Spa Valley Railway.".