Matches in DBpedia 2016-04 for { ?s ?p "The British Rail Class 411 (or 4 Cep) electrical multiple units were built at Eastleigh works from 1956-63 for the newly electrified main lines in Kent. These units were based on the earlier Southern Railway 4 Cor design, built in 1937. Variants of the class 411 design included the class 410 and class 412 4 Bep units, which contained a buffet car in place of a standard trailer."@en }
Showing triples 1 to 2 of
2
with 100 triples per page.
- British_Rail_Class_411 comment "The British Rail Class 411 (or 4 Cep) electrical multiple units were built at Eastleigh works from 1956-63 for the newly electrified main lines in Kent. These units were based on the earlier Southern Railway 4 Cor design, built in 1937. Variants of the class 411 design included the class 410 and class 412 4 Bep units, which contained a buffet car in place of a standard trailer.".
- Q1979316 comment "The British Rail Class 411 (or 4 Cep) electrical multiple units were built at Eastleigh works from 1956-63 for the newly electrified main lines in Kent. These units were based on the earlier Southern Railway 4 Cor design, built in 1937. Variants of the class 411 design included the class 410 and class 412 4 Bep units, which contained a buffet car in place of a standard trailer.".