DBpedia – Linked Data Fragments

DBpedia 2016-04

Query DBpedia 2016-04 by triple pattern

Matches in DBpedia 2016-04 for { ?s ?p "The Balloki Power Plant is a 1,223 MW natural gas power plant currently under construction near Kasur, in the Punjab province of Pakistan. Groundbreaking was commenced by Prime Minister Nawaz Sharif on November 11, 2015, and construction is scheduled for completion by December 2017. The project will utilize re-gasified liquefied natural gas (RLNG) for fuel, with diesel as an alternate backup. A 40 kilometer long transmission line with a capacity of 500 kilovolts will also be constructed between the new plant and a grid station in southern Lahore.Bidding was open to international firms for the 82 billion ruppee project. China’s Harbin Electric Company was announced as the lowest evaluated bidder for the project on October 2, 2015, having offered a levellised electricity cost of 7.973 cents per unit, outbidding the Turkish conglomerate Enka İnşaat ve Sanayi A.Ş and GE Consortium which both stood in second with 8.185 cents per unit tariff, followed by China Machinery Eng Co (CMEC) & SEFC at 8.304 cents, and Hyundai Engineering at 8.332 cents per unit."@en }

Showing triples 1 to 1 of 1 with 100 triples per page.