Matches in DBpedia 2016-04 for { ?s ?p "In 1871, the first actual system was begun with log pipes and wooden mains . . . The Rattlesnake Intake Dam was built in 1901 with a settling basin capacity of 3 million gallons . . . Missoula's water needs were met by the Rattlesnake Creek until 1935, when five wells were added to augment fall and summer demands. In fact, the watershed was used until 1983, when a Giardia problem arose and its use was discontinued." }
Showing triples 1 to 1 of
1
with 100 triples per page.
- History.htm quote "In 1871, the first actual system was begun with log pipes and wooden mains . . . The Rattlesnake Intake Dam was built in 1901 with a settling basin capacity of 3 million gallons . . . Missoula's water needs were met by the Rattlesnake Creek until 1935, when five wells were added to augment fall and summer demands. In fact, the watershed was used until 1983, when a Giardia problem arose and its use was discontinued.".