Matches in DBpedia 2016-04 for { ?s ?p "Construction works to upgrade segments of the Karakoram Highway can be traced to 2013, when China began construction on a 24 kilometer bypass of Attabad Lake with a combination of 5 km worth of tunnels, 2 large bridges, and 78 small bridges to bypass the lake which had been formed after a 2010 earthquake triggered massive landslides. The resulting landslides cut off both the Indus River and Karakoram Highway resulting in the formation of the reservoir."@en }
Showing triples 1 to 1 of
1
with 100 triples per page.
- Karakorum_Highway_Realignment_(China-Pakistan_Friendship_Tunnels) comment "Construction works to upgrade segments of the Karakoram Highway can be traced to 2013, when China began construction on a 24 kilometer bypass of Attabad Lake with a combination of 5 km worth of tunnels, 2 large bridges, and 78 small bridges to bypass the lake which had been formed after a 2010 earthquake triggered massive landslides. The resulting landslides cut off both the Indus River and Karakoram Highway resulting in the formation of the reservoir.".