Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/WNP-1_and_WNP-4> ?p ?o }
- WNP-1_and_WNP-4 abstract "Washington Nuclear Project Nos. 1 and 4, abbreviated as WNP-1 and WNP-4 were two of the five nuclear power plants on which construction was started by the Washington Public Power Supply System (WPPSS) in order to meet projected electricity demand in the Pacific Northwest. WNP-1, WNP-2 and WNP-3 were part of the original 1968 plan, with WNP-4 (a twin to WNP-1 and located at the same site) and WNP-5 (a twin to WNP-3, in similar fashion) added in the early 1970s.WNP-1 and -4 are located on 972 acres (393 ha), within the boundaries of the Hanford Reservation in the U.S. state of Washington, approximately 1.5 miles (2.4 km) east of the Columbia Generating Station. The WNP-1 site has been proposed as a potential pilot location for small modular reactors.".
- WNP-1_and_WNP-4 buildingStartDate "1975".
- WNP-1_and_WNP-4 buildingStartYear "1975".
- WNP-1_and_WNP-4 country United_States.
- WNP-1_and_WNP-4 installedCapacity "2.534E9".
- WNP-1_and_WNP-4 location Benton_County,_Washington.
- WNP-1_and_WNP-4 location Richland,_Washington.
- WNP-1_and_WNP-4 location Washington_(state).
- WNP-1_and_WNP-4 owner Energy_Northwest.
- WNP-1_and_WNP-4 status "canceled".
- WNP-1_and_WNP-4 thumbnail WNP-1_-4.jpg?width=300.
- WNP-1_and_WNP-4 wikiPageExternalLink exboardreview.pdf.
- WNP-1_and_WNP-4 wikiPageExternalLink plan.
- WNP-1_and_WNP-4 wikiPageExternalLink story.php?story_id=10644.
- WNP-1_and_WNP-4 wikiPageExternalLink newspapers?id=e_ZLAAAAIBAJ&sjid=Ce4DAAAAIBAJ&pg=3554%2C175556.
- WNP-1_and_WNP-4 wikiPageExternalLink newspapers?id=w-URAAAAIBAJ&sjid=Ie4DAAAAIBAJ&pg=3262%2C847969.
- WNP-1_and_WNP-4 wikiPageExternalLink story.php?story_id=10644.
- WNP-1_and_WNP-4 wikiPageExternalLink exboardreview.pdf.
- WNP-1_and_WNP-4 wikiPageID "21994338".
- WNP-1_and_WNP-4 wikiPageLength "18227".
- WNP-1_and_WNP-4 wikiPageOutDegree "39".
- WNP-1_and_WNP-4 wikiPageRevisionID "681993623".
- WNP-1_and_WNP-4 wikiPageWikiLink Avista.
- WNP-1_and_WNP-4 wikiPageWikiLink Babcock_&_Wilcox.
- WNP-1_and_WNP-4 wikiPageWikiLink Babcock_and_Wilcox.
- WNP-1_and_WNP-4 wikiPageWikiLink Bechtel.
- WNP-1_and_WNP-4 wikiPageWikiLink Bellefonte_Nuclear_Generating_Station.
- WNP-1_and_WNP-4 wikiPageWikiLink Benton_County,_Washington.
- WNP-1_and_WNP-4 wikiPageWikiLink Bonneville_Power_Administration.
- WNP-1_and_WNP-4 wikiPageWikiLink Brock_Adams.
- WNP-1_and_WNP-4 wikiPageWikiLink Category:Buildings_and_structures_in_Benton_County,_Washington.
- WNP-1_and_WNP-4 wikiPageWikiLink Category:Uncompleted_nuclear_reactors.
- WNP-1_and_WNP-4 wikiPageWikiLink Columbia_Generating_Station.
- WNP-1_and_WNP-4 wikiPageWikiLink Columbia_River.
- WNP-1_and_WNP-4 wikiPageWikiLink Energy_Northwest.
- WNP-1_and_WNP-4 wikiPageWikiLink Hanford_Reservation.
- WNP-1_and_WNP-4 wikiPageWikiLink Hanford_Site.
- WNP-1_and_WNP-4 wikiPageWikiLink List_of_nuclear_reactors.
- WNP-1_and_WNP-4 wikiPageWikiLink N-Reactor.
- WNP-1_and_WNP-4 wikiPageWikiLink Neil_Goldschmidt.
- WNP-1_and_WNP-4 wikiPageWikiLink Nuclear_power_plant.
- WNP-1_and_WNP-4 wikiPageWikiLink Oconee_Nuclear_Generating_Station.
- WNP-1_and_WNP-4 wikiPageWikiLink Oconee_Nuclear_Station.
- WNP-1_and_WNP-4 wikiPageWikiLink Portland_General_Electric.
- WNP-1_and_WNP-4 wikiPageWikiLink Pressurized_water_reactor.
- WNP-1_and_WNP-4 wikiPageWikiLink Puget_Sound_Energy.
- WNP-1_and_WNP-4 wikiPageWikiLink R._W._Beck,_Inc..
- WNP-1_and_WNP-4 wikiPageWikiLink Rancho_Seco_Nuclear_Generating_Station.
- WNP-1_and_WNP-4 wikiPageWikiLink Richland,_Washington.
- WNP-1_and_WNP-4 wikiPageWikiLink Sid_Morrison.
- WNP-1_and_WNP-4 wikiPageWikiLink Skagit_Valley.
- WNP-1_and_WNP-4 wikiPageWikiLink Small_modular_reactor.
- WNP-1_and_WNP-4 wikiPageWikiLink Southern_California_Edison.
- WNP-1_and_WNP-4 wikiPageWikiLink Tennessee_Valley_Authority.
- WNP-1_and_WNP-4 wikiPageWikiLink Three_Mile_Island.
- WNP-1_and_WNP-4 wikiPageWikiLink Three_Mile_Island_Nuclear_Generating_Station.
- WNP-1_and_WNP-4 wikiPageWikiLink Three_Mile_Island_accident.
- WNP-1_and_WNP-4 wikiPageWikiLink United_States.
- WNP-1_and_WNP-4 wikiPageWikiLink WNP-3_and_WNP-5.
- WNP-1_and_WNP-4 wikiPageWikiLink Washington_(U.S._state).
- WNP-1_and_WNP-4 wikiPageWikiLink Washington_(state).
- WNP-1_and_WNP-4 wikiPageWikiLinkText "Columbia (WPPSS-1)".
- WNP-1_and_WNP-4 wikiPageWikiLinkText "Columbia (WPPSS-4)".
- WNP-1_and_WNP-4 wikiPageWikiLinkText "WNP-1 and WNP-4".
- WNP-1_and_WNP-4 wikiPageWikiLinkText "WNP-1".
- WNP-1_and_WNP-4 wikiPageWikiLinkText "WNP-4".
- WNP-1_and_WNP-4 commissioned "N/A".
- WNP-1_and_WNP-4 constructionBegan "1975".
- WNP-1_and_WNP-4 coordinatesDisplay "inline,title".
- WNP-1_and_WNP-4 country United_States.
- WNP-1_and_WNP-4 hasPhotoCollection WNP-1_and_WNP-4.
- WNP-1_and_WNP-4 imageAlt "Aerial photograph of WNP-1/4 site.".
- WNP-1_and_WNP-4 imageCaption "WNP-1/4 site in 2009, with WNP-1 to the south and WNP-4 to the north. The turbine building extends northeast of the containment, and the auxiliary building extends south of the containment.".
- WNP-1_and_WNP-4 imageSize "250".
- WNP-1_and_WNP-4 latD "46.4715".
- WNP-1_and_WNP-4 latNs "N".
- WNP-1_and_WNP-4 location "North of Richland, Benton County, Washington".
- WNP-1_and_WNP-4 locationMap "USA Washington".
- WNP-1_and_WNP-4 longD "119.317".
- WNP-1_and_WNP-4 longEw "W".
- WNP-1_and_WNP-4 name "WNP-1/4".
- WNP-1_and_WNP-4 nameOfficial "Nuclear Project Nos. 1 and 4".
- WNP-1_and_WNP-4 npReactorSupplier Babcock_&_Wilcox.
- WNP-1_and_WNP-4 npReactorSupplier Babcock_and_Wilcox.
- WNP-1_and_WNP-4 npReactorType Pressurized_water_reactor.
- WNP-1_and_WNP-4 owner Energy_Northwest.
- WNP-1_and_WNP-4 psElectricalCapacity "2534.0".
- WNP-1_and_WNP-4 psUnitsPlanned "2".
- WNP-1_and_WNP-4 status "canceled".
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Cite_news.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Cite_report.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Convert.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Coord.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Ill.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Infobox_power_station.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:Reflist.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:U.S._nuclear_plants.
- WNP-1_and_WNP-4 wikiPageUsesTemplate Template:USD.
- WNP-1_and_WNP-4 subject Category:Buildings_and_structures_in_Benton_County,_Washington.
- WNP-1_and_WNP-4 subject Category:Uncompleted_nuclear_reactors.