DBpedia – Linked Data Fragments

DBpedia 2015-10

Query DBpedia 2015-10 by triple pattern

Matches in DBpedia 2015-10 for { ?s ?p "The Meghri Dam (also known as the Aras Dam or Aras Watershed Dam) is a hydroelectric dam currently under construction on the Aras River near Armenia's southern town of Meghri on the Armenia–Iran border.The joint Iranian–Armenia project was proposed in 1990s and was discussed between Iranian and Armenian authorities. Intergovernmental agreements between Armenia and Iran were signed in 2007 and 2008. On 14 April 2009, energy ministries of Armenia and Iran signed a memorandum on financing construction of the Meghri power station of Armenian side. The dam and power stations construction contract was signed on 16 October 2010 with Farab Sepasad Company. A ceremony on 17 November 2012, attended by Iran's Minister of Energy and the Armenian President, officially began construction.The basic studies were carried out by Arm-Hydroenergo-Project Company and Mahab-E-Qods Consulting Engineers Company in 1999. The Meghri station will be operated by Iran for 15 years after which it will be returned to Armenia free of charge.The project is expected to cost US$400 million."@en }

Showing triples 1 to 1 of 1 with 100 triples per page.