Matches in DBpedia 2015-10 for { ?s ?p "The Changping Line of the Beijing Subway (Chinese: 北京地铁昌平线; pinyin: běijīng dìtiě chāngpíng xiàn) is a mostly elevated rapid transit line in northern Beijing. The line started construction in 2009. In September 2010, Construction was completed, and was followed by three-month test run. The line opened on December 30, 2010 and currently runs north from the Xi'erqi station on Line 13 to Nanshao. It is 21.24 km in length with 7 stations, only Nanshao is underground."@en }
Showing triples 1 to 1 of
1
with 100 triples per page.
- Changping_Line,_Beijing_Subway comment "The Changping Line of the Beijing Subway (Chinese: 北京地铁昌平线; pinyin: běijīng dìtiě chāngpíng xiàn) is a mostly elevated rapid transit line in northern Beijing. The line started construction in 2009. In September 2010, Construction was completed, and was followed by three-month test run. The line opened on December 30, 2010 and currently runs north from the Xi'erqi station on Line 13 to Nanshao. It is 21.24 km in length with 7 stations, only Nanshao is underground.".