Matches in DBpedia 2015-10 for { ?s ?p "Bathurst – September 1924 – The work of preparing for electricity scheme is proceeding satisfactorily, and most of the poles have already been erected, while several houses and business premises have been wired and prepared for the installation of electric light. It is generally anticipated that it will be possible to switch on the current in about a months’ time."@en }
Showing triples 1 to 1 of
1
with 100 triples per page.
- History_of_infrastructure_development_in_Bathurst text "Bathurst – September 1924 – The work of preparing for electricity scheme is proceeding satisfactorily, and most of the poles have already been erected, while several houses and business premises have been wired and prepared for the installation of electric light. It is generally anticipated that it will be possible to switch on the current in about a months’ time.".