Matches in DBpedia 2016-04 for { ?s ?p "The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A."@en }
Showing triples 1 to 2 of
2
with 100 triples per page.
- Pennsylvania_Canal_Tunnel comment "The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A.".
- Q7163676 comment "The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A.".