DBpedia – Linked Data Fragments

DBpedia 2016-04

Query DBpedia 2016-04 by triple pattern

Matches in DBpedia 2016-04 for { ?s ?p "Critical path drag is a project management metric developed by Stephen Devaux as part of the Total Project Control (TPC) approach to schedule analysis and compression in the critical path method of scheduling. Critical path drag is the amount of time that an activity or constraint on the critical path is adding to the project duration."@en }

Showing triples 1 to 2 of 2 with 100 triples per page.