Matches in DBpedia 2015-10 for { ?s ?p "USNS Montford Point (T-ESD-1, ex-T-MLP-1), the lead ship of her class of Mobile Landing Platforms (MLP), is a ship named in honor of African American Marine Corps recruits who trained at Montford Point Camp, North Carolina, from 1942 to 1949. After $115 million was allocated for long-lead time material and advanced design efforts, in late 2010 General Dynamics's National Steel and Shipbuilding Company was awarded the contract, worth approximately $500 million, to build the first of three planned vessels."@en }
Showing triples 1 to 1 of
1
with 100 triples per page.
- USNS_Montford_Point_(T-ESD-1) abstract "USNS Montford Point (T-ESD-1, ex-T-MLP-1), the lead ship of her class of Mobile Landing Platforms (MLP), is a ship named in honor of African American Marine Corps recruits who trained at Montford Point Camp, North Carolina, from 1942 to 1949. After $115 million was allocated for long-lead time material and advanced design efforts, in late 2010 General Dynamics's National Steel and Shipbuilding Company was awarded the contract, worth approximately $500 million, to build the first of three planned vessels.".