Matches in DBpedia 2015-10 for { ?s ?p "The West Wallsend Steam Tram Line in Australia was an extension of the tram line from Newcastle, New South Wales to Wallsend, New South Wales. Construction of the tram line began in April 1909 and opened for passenger services on 19 December 1910. The route from Newcastle to West Wallsend was 25 km (16 mi) long and took about one and a half hours. The line was standard gauge and the tram was powered by a steam motor which hauled two passenger cars or carriages."@en }
Showing triples 1 to 2 of
2
with 100 triples per page.
- West_Wallsend_Steam_Tram_Line abstract "The West Wallsend Steam Tram Line in Australia was an extension of the tram line from Newcastle, New South Wales to Wallsend, New South Wales. Construction of the tram line began in April 1909 and opened for passenger services on 19 December 1910. The route from Newcastle to West Wallsend was 25 km (16 mi) long and took about one and a half hours. The line was standard gauge and the tram was powered by a steam motor which hauled two passenger cars or carriages.".
- West_Wallsend_Steam_Tram_Line comment "The West Wallsend Steam Tram Line in Australia was an extension of the tram line from Newcastle, New South Wales to Wallsend, New South Wales. Construction of the tram line began in April 1909 and opened for passenger services on 19 December 1910. The route from Newcastle to West Wallsend was 25 km (16 mi) long and took about one and a half hours. The line was standard gauge and the tram was powered by a steam motor which hauled two passenger cars or carriages.".