DBpedia – Linked Data Fragments

DBpedia 2015-10

Query DBpedia 2015-10 by triple pattern

Matches in DBpedia 2015-10 for { ?s ?p "The Vitimsky Hydroelectric Power Plant (HPP) Cascade is a proposed group of hydropower plants on the Vitim River in the Buryatia and Irkutsk regions of Russia.The first stage consists of the proposed Mokskaya HPP, with a planned capacity of 1,200 MW, and an average annual production of c. 4.54 billion kWh.The second stage consists of the projected Ivanovo HPP, with a planned capacity of 210 MW, and an average annual production of c. 1.03 billion kWh.The third stage: the projected Yangudinskaya HPP, with a planned capacity of 360 MW.The fourth stage: the projected Karalonskaya HPP, with a planned capacity of 450 MW.The fifth stage: the projected Signayskaya HPP, with a planned capacity of 590 MW.The sixth stage: the projected Bodaibo HPP, with a planned capacity of 600 MW."@en }

Showing triples 1 to 1 of 1 with 100 triples per page.